My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-10-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/04/2022 Special and Regular
>
Agenda Packet_2022-10-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 1:32:09 PM
Creation date
10/3/2022 11:15:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/4/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
562
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Specifications <br />Technical specifications for all components listed above shall be provided by Consultant, or their Sub - <br />consultants, to the City in CSI (Construction Specifications Institute) format. Consultant shall coordinate <br />language between the general and technical specifications to ensure conflicts are minimized. City Staff will <br />combine these specifications with the City Boiler Plate which together, will become the Project Manual. <br />Final Opinion of Probable Cost <br />Consultant shall provide updated opinion of probable construction cost which shall reflect finalized plans, <br />materials, systems, details of construction, and known or anticipated changes in the bidding market relative to <br />the project. Should project scope exceed available budget, project plans/specifications will be phased as <br />appropriate. <br />Task 5: Bid Advertisement, Construction Administration, Record Drawings: <br />Bid Advertisement <br />Consultant shall provide support to the City during the Bidding phase by assisting with questions, <br />requests for information/clarification, or conflicts arising out of the bidding process. Consultant shall <br />also attend pre -bid meeting, if scheduled. <br />Construction Administration <br />Consultant shall provide support to the City during the Construction Administration phase by assisting <br />with questions, requests for information/clarification, and/or reviewing submittals. <br />Record Drawings /As -built Plans: <br />Upon construction completion, consultant shall incorporate as -built information, as provided by <br />the General Contractor, into the drawing files to provide record drawings for City archives. <br />Fee Proposal: <br />In addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured to <br />correspond to the above mentioned tasks as follows: <br />Task 1: Pre -Design <br />Task 2: Concept Design <br />Task 3: Design Development <br />Task 4: Construction Documents <br />Task 5: Bid Advertisement, Construction Administration, Record Drawings <br />Total Fee: <br />Fee schedule for each task should include an hourly breakdown that corresponds to the task total. <br />City Responsibilities <br />The City will be responsible for the following items: <br />• Provision of available plans and existing documentation on file. <br />• Provision of electronic design file with City title block and title sheet (24" x 36") <br />• Provision of standard City boilerplate specifications. <br />• Acting as liaison with the appropriate decision making bodies, as necessary. <br />• Coordination and processing of plans and documents with governmental agencies having <br />City Council city or Santa Ana Nllw 1�Ili1 10/4/2022 <br />Page Al-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.