My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-10-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/04/2022 Special and Regular
>
Agenda Packet_2022-10-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 1:32:09 PM
Creation date
10/3/2022 11:15:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/4/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
562
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana [ Public Health and Wellness Proging <br />Project Schedule RFPNrammo.22-062 <br />ID <br />ask ink Name Non inisM1 retleressars <br />B <br />M Ma Ma Ma Ma lun lun lun lun lul lul IUI lul lul Au Au Au Au Se Se Se Se 11 11 OR Oct 01 N No N No Dec Dec Oec Dec Ian Ian Ian Ian Ian Feb Feb Feb Feb Ma Ma Ma Ma r A r A r A r r Ma Ma Ma Ma hi, lun lun Jun lul lul lul lul lul Au Au Au Au Se Se s Y 0[t Oct OG Oct OR N N N No Dec Dx Dec Dx Dec Ian 1 <br />Matle <br />a <br />2 <br />a Nod,ptro[eed Odays Tue 5/3/22 Tue 5/3/22 <br />3 <br />�q cask l: Pre -Design 11 days Tue 5/3/12 Tue Si <br />t; <br />Kick Off Meeting Iday Tue S/3/21 Tue S/3/22 1 <br />5 <br />�p Interview 5hp Wed 5/4/22 Tue 5/10/22 4 <br />6 <br />'d Review existing inkrmation 10 days Wed S/11/22 Tue 5/24/22 S <br />71 <br />2 <br />Develop Work Task Plan&Schedule 5diis Wed 5/25/22 Tue 5/31/22 6 <br />0 <br />�p She survey to days weds/4/22 Tue 5/17/22 4 <br />imm <br />9 <br />�p Geo Tech Investigation 14 days Wed 5/4/22 Mon 5/23/224 <br />611111111111111111 <br />�q Task 2: Concept Design 61 days Wed 6/1/12 Wetl 8/24/21 <br />Meeting with the Ciry staff Iday Wed 6/1/22 Wed 6/1/22 T <br />12 <br />Prepare Concept Design Deliverable 20 days Thu6/2/22 Wed 6/29/2211 <br />13 <br />Workshop& Community Outreach 20 days Thu6/30/22 Wed 7/27/2212 <br />14 <br />Implement Comments& Input from the Ciry 10 days Thu 7128122 Wed 8/10/2213 <br />CM Revfew&approval to days Thu B/11/22 Wed B/24/2214 <br />16 <br />�p task 3: Design DevelnpmerR)5U% CO) 65 days Thu 8/25/12 Wed 11/23/2: <br />12 <br />Prepare Design Development based on the approved 15 days Thu 8/2S/22 Wed 9/14/2215 <br />Conceptual Design <br />18 <br />Review Meeting with City to develop furtherinterior& 5days Thu 9/15/22 Wed 9/21/2217 <br />exterior material finishes <br />l9 <br />�p Prepare Consimction Cost Estimate 5days Thu 9/22/22 Wed 9/28/22 18 <br />20 <br />'d Architectural Engineering Development&Production 30 days Thu 9/29/22 Wed 11/9/2219 <br />21 <br />City Internal Review 10 days Thu 11/10/22 Wed 11/23/222D <br />22 <br />'p Task 4: Construction I)o—Ms(90%&100%CD) 90 days Thu 11/24/22 Wed 3/29/23 <br />23 <br />�p Cons[ru[tion Drawings 90%CD 30 days Thu 11/24/22 Wed 1/4/23 21 <br />24 <br />Provide Specifications& khedule for 90% CD 10 days Thu 1/5/23 Wed 1/18/2323 <br />a C—r—blldy Reviews 5Ma no 1/19/23 Wed 1/25/2324 <br />M <br />Address Constructability Review 10 days Thu 1/26/23 Wed 2/8/23 25 <br />22 <br />Update Probable Construcipn Cost 5days Thu 2/9/23 Wed 2/15/2326 <br />28 <br />'d Plan Che[k Submittal& Responses to 100%CD 30 days no 2/16123 Wed 3/29/2327 <br />29 <br />�q Task S: Bid Advertise ment, CA&Record Dings 207 days Thu 313D/23 Fri 1112124 <br />P <br />30 <br />�p Bid Advertisement So days Thu 3/30/23 Wed 4/12/2328 <br />31 <br />Job Walk Iday Thu 4/13/23 Thu 4/13/23 30 <br />a Bid Period 15 days Fri 4/14/23 Thu 5/4/23 31 <br />33 <br />�p Award Construction C.0- 15 days Fri 515/23 Thu 5/25/23 32 <br />34 <br />Provide ronformed setof—st-io, document Iday Fri 5/26/23 Fn 5/26/23 33 <br />35 <br />Mobiliazation 10 days Mon 5129/23 Fri 6/9/23 34 <br />�q Demolition&St, Prep 20 tlay5 Mon 6/12/23 Fil 2/7/23 35 <br />32 <br />New Construction 120 days Mon 7/10/23 Fri 12/22/23 36 <br />38 <br />�p Punch List 5days Mon 12/25/2E Fin 12/29/23 32 <br />39 <br />a Subta W Completion d Ma Fri 12/29/23 Fn 12/29/23 38 <br />d0 <br />�p Prepare & Submit Record Dmwings 10 tlay5 Mon 111/24 Fin 1/12124 39 <br />No.. di, Ana Plaza-Mkm <br />Task I lulls�i a ♦ ProleRSummary e11 Fxtemal Milestone • InMi+e Milestone -16 flan ManualSummaryR011uD Startronly C Deadline10/4/2022 <br />Gate: Tue S/3/23 <br />SDItt ..........., Summary �1 External Tasks Inanive cask O InMMe Summary .-owanly Manual Summary �1 FInNM1anly 3 Progress <br />IDSP Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.