My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (7)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:46:03 PM
Creation date
10/4/2022 11:01:40 AM
Metadata
Fields
Template:
Contracts
Company Name
-TETRA TECH, INC.
Contract #
A-2022-158-01
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />Tetra Tech is a Delaware Corporation (publicly <br />traded) and has been in business for over <br />56 years. Founded in 1966, Tetra Tech is a <br />nationally -recognized engineering and resource <br />management firm of more than 21,000 <br />engineers, scientists, construction specialists, <br />and technical support personnel in 450 offices <br />worldwide. Listed on the NASDAQ Exchange <br />(TTEK), Tetra Tech's annual revenues now <br />exceed $3.2 billion (2021). Thus, we are in an <br />excellent financial position and can provide the <br />necessary resources to rapidly deploy and meet <br />aggressive project schedules. Tetra Tech <br />consistently ranks among the top engineering <br />firms annually according to the Engineering <br />News -Record. In <br />2022, Tetra Tech <br />was ranked 4th <br />among the top 500 <br />design firms <br />nationwide and <br />was ranked #1 in <br />the water service <br />industry for the <br />19th year in a row! <br />This project will be <br />managed and <br />directed from our <br />Irvine office location: <br />17885 Von Karman, <br />Suite 500. The <br />primary contact for <br />this project will be Mr. Tom Epperson, PE, <br />President; telephone 949/809-5156; <br />fax 949/809-5010; <br />e-mail tom.epperson@tetratech.com. <br />CITY EXPERIENCE <br />Vice <br />We believe our best relevant experience is the <br />more than 47 projects that we have completed <br />for the City of Santa Ana (City) since 1999. We <br />are confident that these past projects with the <br />City will attest to our technical excellence, <br />responsive staff and our complete <br />understanding of the City's water and sewer <br />facilities. Our previous work for the City included <br />a wide range of engineering services, including: <br />pipelines, pump stations; reservoirs; wells; lift <br />stations; flow control facilities; upgrading of the <br />City's water and wastewater facilities; <br />mechanical, structural, electrical and <br />instrumentation design; studies and <br />miscellaneous support. During these projects, <br />we have developed a working relationship with <br />the City's Public Works staff, Parks and Building <br />Departments and Construction Management <br />groups. Because of Tetra Tech's large pool of <br />talented engineers and scientists, we will be <br />able to respond to the full spectrum of issues <br />dealing with the City's water and wastewater <br />facilities. We believe that the City is our best <br />reference for our performance and execution of <br />our past contracts. Summarized below are the <br />various type of projects that we have performed <br />for the City since 1999: <br />• East Station and West Station Chemical <br />Facilities, Sodium Hypochlorite Generation <br />and Storage Systems and Building; <br />• Crooke Reservoir and Pump Station <br />Improvements, Well 28, Well 27, and Crooke <br />Pump Station Upgrades; <br />• Elevated Tank Documentation for Property <br />Acquisition; <br />• Boilerplate Specifications Update, Update <br />City Boilerplate to 2018 Greenbook; <br />• 20-Inch Water Main Relocation at two <br />intersections for Railcar; <br />• SA-1 Hydro -Generator Replacement; <br />• Washington Well Drilling and CEQA Phase, <br />New Well Drilling Phase 1; <br />• SA-7 Pipeline Relocations, Warner, Bristol, <br />Centennial Park, Mid City, Pico -Lowell and <br />Central Water Main Replacements; <br />• San Lorenzo Force Main and Sewer Main <br />Improvements, Westminster and McFadden <br />Avenue Sewer Replacements; <br />• Pump Stations: John Garthe Pump Station <br />Upgrades, P&ID Plans, Crooke MCC <br />Replacement and South Station Booster <br />Pump Modifications; <br />• Wells: Well 32 Rehabilitation, Typical <br />Chemical Buildings, Well 24 Electrical <br />Upgrades, Well 39 and Well 34 <br />Modifications; <br />• Reservoir: John Garthe Phase 2 and <br />Elevated Tank Safety Improvements and <br />Painting; and <br />• Lift Stations: San Lorenzo and Maxine <br />Emergency Bypass. <br />TETRA TECH Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.