Laserfiche WebLink
PIPELINE PROJECTS BY PROJECT TEAM <br />Client Project Name Length (ft) Size (in) Design <br />Complete <br />Potable and Recycled Water (over 300 miles in last 15 years) <br />Moulton Niguel Water District Crown Valley Main Replacement 9,600 12" —Oct 2022 <br />Cole St, 5th St, Florence Ave, Semolina - <br />City of Downey and Melva St 7'000 8"-12" 2021-Current <br />Mesa Water District <br />1951 Cohort Pipeline Replacement <br />22,100 <br />6"-16" <br />Current <br />! City of Anaheim <br />_ <br />La Palma Ave and Tustin Ave Water <br />Main Replacement at Railway Crossing <br />600 <br />12"-36" <br />2021 <br />Golden State Water Company <br />Water Main Replacement (3 projects) <br />24,700 <br />8%12" <br />2020 - 2021 <br />City of Lakewood <br />Water Main Replacement (Annual) <br />150,000 <br />8" <br />2002 - 2019 <br />Central Basin MWD <br />La Mirada Recycled Water Pipeline <br />28,700 <br />4"-20" <br />2018 <br />City of Anaheim <br />Katella Ave. Water Main Replacement <br />7,000 <br />12"-16" <br />2017 <br />City of Santa Ana <br />Water Main Replacement (5 projects) <br />50,000 <br />8"-12' <br />2007 - 2017 <br />Upper San Gabriel Valley MWD <br />Phase IIB Package 3 RW <br />20,000 <br />4"-12" <br />2007 - 2017 <br />El Toro Water District <br />Recycled Water Expansion <br />127,700 <br />4"-24" <br />2016 <br />City of Newport Beach <br />Newport Blvd. Water Main Replacement <br />5,300 <br />W-24" <br />2016 <br />Irvine Ranch Water District <br />Peters Canyon Channel Reuse Pipeline <br />17,000 <br />10"-16" <br />2016 <br />Sewer Relining, Rehabilitation and Replacement <br />Moulton Niguel Water District ! Crown Valley Force Main Replacement 9,400 12" Oct 2022 <br />Moulton Niguel Water District <br />Regional Lift Station Force Main <br />Replacement <br />16,000 <br />24" <br />2020 <br />Orange County Sanitation District <br />Gisler-Redhill <br />3,600 <br />21"-33" <br />2015 <br />Orange County Sanitation District <br />SARI and Yorba Linda Spur - <br />25,500 <br />15" & 54" <br />2013 <br />! Long Beach Water Department <br />Orange/Del Amo/15th Street <br />5,200 <br />8"-15" <br />2013 <br />City of Hawthorne <br />Sewer Improvement Project <br />3,700 <br />10" & 12" <br />2013 <br />City of Santa Ana <br />Westminster Avenue & McFadden Sewer <br />4,900 <br />12"-15" <br />2013 <br />Long Beach Water Department <br />Broadway Phase 3 Relining <br />3,D00 <br />14" & 18" <br />2009 <br />City of Buena Park <br />Westminster Ave. and Beach Blvd. <br />Siphon <br />3,000 <br />8" & 15" <br />2009 <br />Flow Control Facilities (15 in the last 15 years) <br />City of Santa Ana <br />SA-7 Relocation <br />Carlsbad Conveyance FCF <br />2021 <br />2016 <br />KSD Joint Venture <br />City of Santa Ana <br />SA-4 and SA-5 <br />2016 <br />Irvine Ranch Water District <br />Relocation of Zone 1 FCF <br />2012 <br />`Orange County WD <br />Kraemer Basin Valve Vault <br />2012 <br />City of Anaheim <br />Sand Canyon PRS <br />2009 <br />Pum Stations (over 27 in the last 15 ears) <br />P y <br />Santiago Pump Station Modification <br />_ <br />Orange County Water District <br />2022 <br />Yorba Linda Water District <br />Timber Ridge Booster Pump Station Replacement <br />2021 <br />! Irvine Ranch Water District <br />Zone 8 to 9 Booster Pump Station <br />2021 <br />City of South Gate <br />i Elizabeth Booster Pump Station <br />2016 <br />_ <br />Irvine Ranch Water District_ <br />_ <br />Peters Canyon Channel Revise Pump Facilities <br />2016 <br />TETRA TECH <br />Page14 <br />