My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (7)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:46:03 PM
Creation date
10/4/2022 11:01:40 AM
Metadata
Fields
Template:
Contracts
Company Name
-TETRA TECH, INC.
Contract #
A-2022-158-01
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
has been found to be successful to accomplish <br />this: <br />• Working Hours <br />• Lane Closures <br />• Storage of Equipment <br />• Open Cut vs. Boring <br />• Trench Backfill <br />• Pavement Removal and Replacement <br />In conjunction with the signing of the plans by <br />the regulatory agencies or receipt of approved <br />permit, Tetra Tech recommends a meeting <br />occur to finalize the cost implications of the <br />backfill and pavement replacement <br />requirements, construction restrictions, traffic <br />control, and other factors which could affect the <br />cost of construction. A memorandum of <br />understanding will be prepared after the meeting <br />and distributed to the attendees for their <br />concurrence. This approach will minimize the <br />potential of change orders to the contractor as a <br />result of requirements added during the <br />construction phase. <br />Utility Coordination: We propose to perform <br />our utility research and investigation immediately <br />upon issuance of the Notice to Proceed for each <br />pipeline. During Design we will contact USA Dig - <br />Alert, send preliminary, second, and final utility <br />notices, field walk the alignment, pothole if <br />necessary, and identify critical utilities. <br />The USA markings for the geotechnical <br />investigation will also be used to verify the <br />location of the existing utilities. In addition, the <br />actual potholing activities will be monitored to <br />assist in the investigation of hazardous <br />materials. The potholing services will be <br />completed by use of the vacuum extraction <br />method, thereby minimizing pavement damage <br />and traffic disruption. <br />In addition, a field walk must be completed to <br />look for evidence of infrastructure (e.g., valve <br />cans, trench patch, vaults, etc.) as some utility <br />owners do not belong to USA Dig Alert, and <br />others respond with only partially complete <br />information. We have learned to take the extra <br />steps to verify potential underground <br />infrastructure. <br />Hazardous Waste: Our previous experience on <br />the West Basin Municipal Water District and <br />Long Beach Water Department projects, have <br />made us sensitive to the negative impacts <br />associated with the discovery of hazardous <br />materials within the pipeline trenches. These <br />materials, if not properly planned for in the <br />contract documents, could have a disastrous <br />effect on the schedule and cost of pipeline <br />projects. Our geotechnical investigation borings <br />will be done on the proposed alignment and will <br />include a sniffer to minimize the potential of <br />finding unknown hazardous materials during <br />construction. The goal is to avoid the hazardous <br />material, but if it must be encountered, it is <br />important to be aware of it, quantify the amount <br />and type and estimate the cost to dispose of it. <br />Traffic Control: When the proposed pipeline <br />alignments are located within highly traveled <br />streets, traffic control will be a major concern of <br />the regulatory agencies. Traffic control plans will <br />be prepared with the objective of providing the <br />contractor with adequate room for safety as well <br />as efficient operation while providing the least <br />possible disruption to the traveling public. We <br />believe that traffic control is a key design <br />element and it will be completed together with <br />the design of the pipeline. <br />Alignment Selection: Proposed pipeline <br />alternative alignments will be evaluated relative <br />to the following items: <br />• Utilities <br />• Hazardous Materials/High Groundwater <br />• Constructability <br />• Traffic Impacts <br />• Community Impacts <br />• Permit Requirements <br />In addition, when the proposed pipelines cross <br />signalized intersections which are highly <br />traveled, the intersections need to be evaluated <br />as to whether bore and jack operation or open - <br />cut construction will be the most beneficial <br />solution. During the preliminary design phase, <br />we will prepare sketches of the proposed bore <br />and receiving pit locations and corresponding <br />traffic control concepts. It should be noted that if <br />the intersections are bored, the streets will not <br />be able to be open to traffic at the end of each <br />work day. <br />Construction Phasing: Construction phasing <br />will be a key element of the project <br />specifications. We will work with the regulatory <br />agencies to minimize,the impacts of the <br />TETRA TECH Page 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.