My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (7)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:46:03 PM
Creation date
10/4/2022 11:01:40 AM
Metadata
Fields
Template:
Contracts
Company Name
-TETRA TECH, INC.
Contract #
A-2022-158-01
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QC review forms will be used to document that <br />internal reviews have been conducted. All <br />comments will be identified with the reviewer's <br />name. When comments are resolved to the <br />satisfaction of the reviewers, the reviewers and <br />our Project Manager will sign off on the review <br />forms. <br />The QA/QC Plan will ensure technical adequacy <br />and QC of work, along with design parameters <br />are translated into planning and design <br />documents. QA/QC will be directed by Mr, Tom <br />Epperson, PE, and led by Mr. Mark Bush, PE, <br />who has more than 27 years of experience. <br />Formal QA/QC reviews are scheduled around <br />project submissions. The review will be <br />completed well ahead of the submission date to <br />allow time to correct potential errors and <br />omissions, including complete subconsultant <br />coordination. In every QA/QC review, a checklist <br />form developed by Tetra Tech for the project is <br />utilized for the review. The reviewer completes <br />the checklist by adding text and makes any <br />additional comments in red on the document. <br />The Project Manager and the QA/QC Manager <br />review the comments for fatal flaws. If none are <br />found, the Project Manager oversees the <br />implementation of the comments by closing <br />each comment on the form with a response and <br />by addressing the changes on the plans by high- <br />lighting the revision. <br />CATEGORY OF SERVICES <br />Tetra Tech will propose on all the category of <br />services except for Construction Inspection. Per <br />the RFP, the following matrix of services is <br />presented: <br />ProposeNo. Service Elect to <br />D•to-Propose <br />1 <br />Planning, Resources, and Design ✓ <br />(a-e) <br />2 <br />Construction Management <br />b) <br />(c) Construction <br />Inspection <br />3 <br />Pipeline Design <br />✓ <br />4 <br />Electrical, Instrumentation and <br />Control Services <br />5 <br />Geotechnical Engineering Services <br />✓ <br />TETRA TECH <br />Page 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.