Laserfiche WebLink
FACILITY PROJECTS <br />The following are three projects that are sample <br />facility projects: <br />® Santiago Pump Station Modification <br />Project, Orange County Water District: <br />The goal of the project is to have the ability <br />to pump water from Santiago Basin to <br />Santiago Creek and/or Burris Pump Station <br />when the water is above 240 feet. The <br />design includes modifying the existing pump <br />station to a floating pump station that would <br />pump water between the elevations of <br />285 feet to 240 feet. <br />® Fleming Reservoir and Zone 8 to 9 Pump <br />Station, Irvine Ranch Water District: <br />These facilities include a 1.3 MG concrete <br />reservoir and three (3) booster pumps and <br />motors within a building. In addition, there <br />was a new RMS building with SHC/ammonia <br />feeds and a diesel fuel storage tank. <br />k• Well 29 and PFAS Treatment Facility, City <br />of Orange: This project included the design <br />of the drilling and equipping of Well No. 29, <br />corresponding disinfection equipment and a <br />new PFOS/PFOA treatment system. <br />Roseton Plant Improvements, Golden <br />State Water Company: This project <br />included the design of a new 0.75 MG <br />reservoir, improvements to the booster <br />pumping station, a new backup power <br />generator, and optional future treatment <br />facilities. <br />Project Descriptions of these four projects are <br />included in the Appendix. Presented in the table <br />below are the references for these facility <br />projects that we encourage the City to contact <br />relative to our similar experience, development <br />of contract documents, and overall project <br />performance. <br />and Contact <br />ProjectClient <br />.•ct Team Responsible <br />Orange County Water District <br />Santiago Pump Station <br />Tom Epperson <br />Fountain Valley, CA <br />Modifications <br />Laurence Esguerra <br />Chris Olsen, PE <br />Mid -Basin Injection Centennial <br />Matt Vera <br />colsen@ocwd.com <br />Burris Pump Station <br />Eric Yuen <br />714/378-3305 <br />Mazen Kassar <br />Irvine Ranch Water District <br />Fleming Reservoir and Zone 8 to 9 <br />Tom Epperson <br />Irvine, CA <br />Pump Station <br />Mike Ted <br />Richard Mori, PE <br />IRWD Wells (10 wells) <br />Erin Cabanero <br />mod@irwd.com <br />IRWD PDF and IDF Chlorine <br />Beverly Encina <br />949/453-5571 <br />Modifications (2 projects) <br />Molly Lovegren <br />IRWD Sand Canyon & IDP <br />Eric Yuen <br />Conveyance Pipelines <br />Mazen Kassar <br />City of Orange <br />Well 29 & PFAS Treatment <br />Tom Epperson <br />Orange, CA <br />Well 28 & Public Mini Park <br />Laurence Esguerra <br />Sonny Tran, PE <br />Well No. 27 Demolition, Drilling and <br />Matt Vera <br />stran@cityoforange.org <br />Equipping <br />Eric Yuen <br />714/288-2475 <br />Mazen Kassar <br />Golden State Water Company <br />Roseton Plant Improvements <br />Tom Epperson <br />Santa Fe Springs, CA <br />Huntington Horn Reservoir <br />Mark Bush <br />Joe Farah, PE <br />Live Oak/Lynrose Pipelines <br />Laurence Esguerra <br />joe.farah@gswater.com <br />Wilmington/Walnut Main <br />Neha Gajjar <br />562/907-9200, x423 <br />Replacements <br />Matt Vera <br />Victor Ramirez <br />Mazen Kassar <br />TETRA TECH <br />Page117 <br />