My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (7)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:46:03 PM
Creation date
10/4/2022 11:01:40 AM
Metadata
Fields
Template:
Contracts
Company Name
-TETRA TECH, INC.
Contract #
A-2022-158-01
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fleming Zone 8 Tank and Zone 8 to 9 Booster Pump Station <br />Improvements <br />Orange County, CA <br />Irvine Ranch Water District (IRWD) provides potable water supply service <br />to the Santiago Area located in an unincorporated region of Orange <br />County. This service area includes four distinct sub -areas containing a <br />system of reservoirs and pump stations that solely rely on the existing <br />150,000-gallon steel Zone 8 Fleming storage reservoir and the existing <br />Zone 8 to 9 booster pump station as the main source of water supply. <br />In 2017, IRWD completed an analysis and recommended improvements <br />for the undersized infrastructure and requirements for additional storage. <br />This project included several primary components, including: <br />• Demolition of the existing reservoir and pump station <br />• A new above ground 1.3 MG prestressed concrete reservoir <br />• Replacement of the Zone 8 to 9 pump station with three 600 GPM <br />pumps <br />• A replacement storage building <br />• An RMS building with sodium hypochlorite/aqueous ammonia treatment <br />• A 2,000-gallon diesel fuel storage tank <br />• Siting for electrical service, controls, and telemetry improvements <br />Project Value: <br />$11,700,000 <br />Schedule: <br />September 2022 <br />Key Staff: <br />Tom Epperson, PE <br />Project Manager <br />Mike Tsoi, PE <br />Team Leader <br />IErin Cabanero, PE <br />Project Engineer <br />Laurence Esguerra, PE <br />Project Engineer <br />Amanda Taylor, PE <br />Process Engineer <br />Mazen Kassar, PE <br />Electrical Engineer <br />Adrian Lee, PE <br />Project Engineer <br />Eric Yuen, PE, SE <br />Structural Engineer <br />Peter Kim, PE, TE <br />Traffic Engineer <br />Reference: <br />Irvine Ranch Water <br />District <br />Irvine, CA <br />Richard Mori, PE <br />949/453-5571 <br />mori@irwd.com <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.