My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:35 AM
Creation date
10/4/2022 11:02:32 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2022-158-03
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/15/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Balancing the Natural and Built Environment <br />May 24, 2022 <br />Robert Aguirre, PE <br />Project Manager <br />City of Santa Ana, Public Works Agency <br />220 S. Daisy Avenue, M-85 <br />Santa Ana, CA 92703 <br />Subject: Proposal for On -Call Water Resources Engineering Services, RFP No. 22-002 <br />Dear Mr. Aguirre: <br />Psomas is providing for your review and consideration our proposal for On -Call Water Resources <br />Engineering Services. Our project team has reviewed the RFP and understands the City of Santa Ana <br />is looking for qualified firms to assist them in providing the necessary water resources engineering <br />design services on an as -needed basis. Therefore, Psomas has assembled a project team of highly <br />qualified professionals who are experts in their fields. <br />Leading the team is Project Manager, Maira Salcedo, PE, who will also serve as the City's primary <br />point of contact for the duration of this contract. Maira's relevant project experience includes serving <br />as project manager for the City's Well 29 Rehabilitation project and the Walnut Pump Station Upgrade <br />project. In addition to her extensive water facility design experience, Maira has recent relevant <br />experience in water pipeline design and the rehabilitation of sewer mains. Maira's qualifications include <br />training through the NASSCO PACP (Pipeline Assessment Certification Program) and MACP (Manhole <br />Assessment Certification Program), making her uniquely qualified to assess the condition of sewer <br />mains and manholes. <br />Supporting Maira are Psomas Project Managers, Mike Swan, PE, and Nancy Baker, PE. Mike <br />specializes in water and sewer planning and hydraulic modeling, as well as design of all types of water <br />and sewer facilities. Nancy is an expert in water and sewer facilities design and replacements. <br />1.13. Contract Agreement Statement: Psomas has read the City of Santa Ana's Standard Agreement <br />and concurs with all provisions as contained in the Agreement provided in the Appendix section of the <br />RFP as Attachment 2. <br />As Principal -in -Charge and a Vice President of Psomas, I, Joseph Boyle, have the authority to <br />contractually bind the company. We consider the City of Santa Ana one of our top clients and look <br />forward to continuing to provide professional services that exceed your expectations. <br />Sincerely, <br />PSl . O M A S <br />Suite <br />Centre Drive Suite 300 <br />Santa Ana, CA 92707 <br />Joseph L. Boyle, PE Maira Salcedo, PE, ENV SP Tel 714.751.7373 <br />Fax 714.545.8883 <br />Vice President Project Manager/Primary Contact www.Psomas.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.