My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:35 AM
Creation date
10/4/2022 11:02:32 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2022-158-03
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/15/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Walnut Pump Station Upgrade <br />Santa Ana, CA <br />■ <br />CLIENT CONTACT: City of Santa Ana <br />200 S. Daisy Street, Santa Ana, CA <br />92703 1 Armando Fernandez, Senior Civil <br />Engineer 1714.647.3316 <br />YEAR COMPLETED: 2019 <br />KEY PERSONNEL: Joseph Boyle I Maira Salcedo <br />Benjamin Halbach I Dave Moritz <br />SUBCONSULTANTS: Arcon <br />Psomas was retained through an on -call <br />design contract with the City of Santa Ana <br />to prepare a preliminary design report, plans <br />and specifications for the construction of new <br />masonry buildings at Walnut Pump Station. <br />Design scope included new 3,650 SF pump <br />building to replace an obsolete building built in <br />1956 and enclose five existing vertical turbine <br />pumps. The building architecture was designed <br />using an Art Deco style to match the recently <br />remodeled Santa Ana High School located <br />across the street. <br />The main building included a new pump room, <br />operations workshop, electrical control room, <br />office space, and bath and shower facilities. Then <br />design also included a separate 200 SF industrial <br />storage building for sodium hypochlorite and POL <br />fuel, a carport structure to shade a generator, an <br />8-foot-high CMU perimeter wall, and two tennis <br />practice courts and practice walls in the adjacent <br />park to mask the perimeter fencing. Two existing <br />steel supply mains were relocated due to the new <br />building footprint and included design of two new <br />valve vaults. <br />On the City's behalf, Psomas submitted this <br />project through ISI Envision and achieved a <br />Bronze award. <br />Cast Iron Main Replacement <br />Long Beach, CA <br />CLIENT CONTACT: Long Beach Water Department <br />1800 E. Wardlow Road <br />Long Beach, CA 908071 Wendy Chen, <br />Senior Project Engineer 1562.570.2324 <br />YEAR COMPLETED: 2019 <br />KEY PERSONNEL: Joseph Boyle I Nancy Baker <br />Benjamin Halbach <br />SUBCONSULTANTS: Arcon <br />As part of our on -call Water Mainline <br />Engineering Support Services for Long Beach <br />Water Department (LBWD), Psomas provided <br />design engineering services for preparation of <br />preliminary and final construction documents <br />(plans, details, and a material list) for the <br />replacement of 6,150 feet of 4-, 6-, 8-, 10-, and <br />12-inch cast iron pipelines. The project involved <br />the replacement of pipeline appurtenances <br />including gate valves, hydrants, air/vacuum <br />assemblies, service meters and respective <br />fittings. The scope of services included utility <br />research and field reconnaissance. Utility <br />research included obtaining a list of all known <br />utility owners from our on-line account with <br />Underground Service Alert, a thorough records <br />research, website investigations of County <br />facilities, and field verification of visible surface <br />facilities by our project design team. Psomas <br />follows up on all of our utility research efforts by <br />obtaining as -built plans from each utility owner <br />and incorporating the facilities into the design <br />plans. As part of the on -call contract, Psomas <br />responded within 48 hours of issuance of the <br />Notice to Proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.