My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:35 AM
Creation date
10/4/2022 11:02:32 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2022-158-03
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/15/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hidden Hills Booster Pump Station <br />Yorba Linda, CA <br />CLIENT CONTACT: Yorba Linda Water District <br />4622 Plumosa Drive, Yorba Linda, CA <br />928851 Rosanne Weston, Engineering <br />Manager 1714.701.3100 <br />YEAR COMPLETED: Ongoing <br />KEY PERSONNEL: Michael Swan I Krista Kausen <br />Psomas was retained by BlackRock, a private <br />developer, to prepare a preliminary design <br />report followed by plans and specifications, <br />and construction support services for <br />improvements to a Yorba Linda Water District <br />booster pump station. These improvements <br />called for increasing the station's capacity and <br />were a condition of a development agreement <br />to construct a residential development in the <br />foothills of Yorba Linda. Psomas is designing <br />this project to YLWD specifications with funding <br />shared between BlackRock and the District. <br />This project consists of removing one 200-GPM <br />pump and pump can within an existing station, <br />and replacing it with an 1,800-GPM, VFD-driven <br />pump. In conjunction with this pump replacement <br />to improve fire -fighting capacity in this pressure <br />zone to be funded by the developer, the District <br />requested that Psomas also replace all existing, <br />outdated electrical and control equipment to be <br />installed in a new, separate electrical room, add <br />a gas -driven emergency generator, add a fence <br />around the perimeter of the site, and replace <br />a damaged meter vault and the meter within <br />the vault. All this work needs to be carefully <br />sequenced and scheduled within a limited <br />shutdown window to minimize downtime for the <br />pump station. <br />Sewer Rehabilitation <br />Rossmoor and Los Alamitos, CA <br />CLIENT CONTACT: Rossmoor/Los Alamitos Area <br />Sewer District <br />3243 Katella Avenue, Los Alamitos, CA <br />90720 1 Sarah Borbon, General Manager <br />562.431.2223 <br />YEAR COMPLETED: 2018 <br />KEY PERSONNEL: Maira Salcedo I Michael Swan <br />Benjamin Halbach <br />Psomas provided design of the sewer segment <br />rehabilitation in various locations in Rossmoor <br />and the City of Los Alamitos. Psomas staff <br />reviewed 60,000 feet of sewer system CCTV <br />tapes and made appropriate recommendations <br />for repairs where needed. The rehabilitation <br />design comprised a combination of CIPP <br />lining of approximately 2,830 feet of 8-inch <br />through 18-inch-diameter sewer in 11 separate <br />locations; UV -Cured Point Repairs (trenchless) <br />at 68 locations; removal and replacement of <br />approximately 860 feet of 8- and 10-inch- <br />diameter pipe in four areas; and point repairs <br />to 8-inch through 18-inch pipe at 14 different <br />locations. <br />Psomas' responsibilities included preparation of <br />construction plans and specifications, bid phase <br />assistance, construction phase engineering, and <br />inspection services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.