Laserfiche WebLink
Education <br />8.S.—Civil Engineering, <br />General Emphasis <br />TA|T& Assodaues,|nc, <br />0 -Call Water Resources Engineering Services <br />Katherine GrImard <br />DESIGNISURVEY ENGINEER <br />Katie |sagraduate ofPmrdueUniversity,OassofMay281l Katie works in <br />TA|TsSurvey Department developing 8asemapyfor roadway and pipeline <br />replacement projects. She has been an essential team member by applying her <br />understanding of engineering design and survey on TAIT's public and private <br />projects. Recent projects include Lome Ridge Underground Basemapsfor <br />Orange County Sheriff Department and OC Public Works and Chino Quadrant III <br />Water Main Replacements. <br />Purdue University, 20I3 Loma Ridge Undergrounds —Design Engineer, 2019 <br />Katie developed BasemaAaand underground plans for new Dry Utilities <br />vi ear mfTo|tTeam <br />Extended from Newport Road |nOrange, CAtoLoma Ridge Emergency <br />Enlistment <br />Operations Center (approximately 4mi|ex). <br />2013 <br />Ch|nm[ivadram%U|WVaterRNainRepiacements,OtyofCh|am—QesignEnXineer, <br />Total Experience 2018-2019 <br />g Katie developed Basemapsand water line replacement plans for 7O00linear <br />Certifications feet 8" water line replacement on 12 residential streets. <br />Engineer |nTraining Kenneth and Ben Lomond Water Main Replacement 9rojectm,Glendale VVater <br />ET31300303 #^ Power — Design Engineer, 2U15-2O16 <br />Katie developed Basemaps and water line replacement plans for approximately <br />11,34Olinear feet ofnew 12'inchand 8-inchdiameter ductile -iron water <br />mains. Existing galvanized and copper services smaller than 1inch were <br />replaced with 1'inchcopper services. Existing fire hydrants were replaced and <br />spacing was increased to provide current fire protection to the neighborhood. <br />P|peHneKXana8ementPro�ramm—�|ty�fG|ende|eWV�terand9oe��Desi0mEnginee�r, 2015-Presemt, <br />Designed the base maps from record maps and aided in coordination of as -built plans with waterline <br />contractor and city plan checker. <br />FYl3/l4&qajorStreet Rehabilitation —Qtyo9Pomon�,U�s/�n�n�in�e�2Q1�-�O15 <br />Pavement and partial sidewalk and ramp replacement. Aided insite walk coordination and plan design, <br />Columbia Square — Kilroy Realty Corp, Design Engineer, ZD13-Present <br />Katie assisted in the design and calculation of the SUSMP controls for the runoff of water into planters. <br />Fullerton Crossings- K8&MRealty Partners \,LP,Desi�nEnginee�2Q13-2OI5 <br />Katie aided inthe design of Fullerton Crossings in the second phase. Responsibilities and tasks assigned <br />included redesign nfstorm-water drains tumeet client's request, movement ofroof run-off drains to <br />resemble architect plans, and erosion control and utility modifications. <br />Promenade Cat Downey —/\|ber' aDevelopment Partners, Design Engineer,2O13-20IS <br />Katie assisted in the procurement of permits and applications through communication with multiple <br />counties toensure success ofproject without impediments, <br />Appendix135 <br />�._--_— <br />