n
<br />v ©n-Gall Water Resources Engineering Services
<br />tk1sc
<br />Joel Brancits, "ESNA
<br />Principal/Partner
<br />As a Prinrivai at tklsc, Joel's responsibilities include being involved in all aspects of
<br />design operations and production activities for the fi. m's complete range a: electrical,
<br />design services, Joel is involved in all phase} of construction document preparation,
<br />including schematic and design development services, energy compliance
<br />documentation, comprehensive electrical, specifications, estimating and coast=-u0ti«n
<br />field -5upp srt.
<br />'rs addition. Joel is also a design leader for school projects and education/institutional
<br />carnpuses, sports club complexes/ recreational racs_ities, commercial centers,
<br />theaters, hotels and industrial facilities. Joel also provides principal management
<br />and creative direction for all projects in which he is involved and is active in tls €sc's
<br />financial, planning and administrative tur;ctions.
<br />Experience:
<br />it Escondido Union School District, Mission Middle School (Escondido, CA)
<br />Addition and modernization at an existing middle school, including a new 2-siory. 18,466 square foot
<br />modular classroom building, Also, modernization of Buildings A thru H, i, K, M and Library approximately
<br />41,4C,0 s iiaar=
<br />0 Irvine Unified School District, Woodbridge High School — Performing Arts Center (In ne,. CA)
<br />A 00-eat theater in the 36,600 square foot Performing arts Complex with the following elements; new
<br />lobby, concessions.and ticket Booth, theater support spaces, control room and greer./dressing room,
<br />dance and drama classrooms, collaborative teaming areas, visual and technicai arts spaces and lastly,
<br />equipment storage space.
<br />! Torrance Unified School District, Various Modernizations at Multiple Campuses (Torrance, CA)
<br />Altercations and upgrades to classroom buildings, administration buildings, auditoriums, .- on service
<br />areas and gym§ on existins eierrientary, middle, and high school campuses in the t S .
<br />• Cypress Unified School District, Modernization of 2 Campuses — Cawthon Elementary School & King
<br />Elementary School (Cypress, CA)
<br />Modernlzaticn of Cawthorr a 20-classroorn ES and King a 21-classroom ES including admmistratloo areas,
<br />multipurpose rooms: and rood service areas. Re-focatableilexpansion scope to include interface of EMS
<br />sya i='ns to air ccindit onmg furnished with relocatable structures,
<br />Education:
<br />Long Leach City College
<br />Architecture Unn ersit f of Southern California Las Angeles
<br />Professional Affiliations:
<br />EEE m Institute of Electrical and Etectronic Engineer-,
<br />IESNA — lilurn rating Engineering Society of North America
<br />.i
<br />T T Appendix 1 39
<br />
|