My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC. (5)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC. (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2022 2:12:39 PM
Creation date
10/17/2022 2:11:36 PM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC.
Contract #
P 21-2740
Agency
Public Works
Council Approval Date
9/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSURANCE NOT REQUIRED <br />o WORK MAY PROCEED <br />CLERK OF COUNCIL DATE: CITY OF SANTA ANA <br />"- <br />_ CONSTRUCTION CONTRACT <br />p PROJECT 21-2740 <br />D � <br />FLOWER STREET BIKE TRAIL RENOVATION FROM CROSSOVER TO WARNER AVENUE <br />PW��-2� <br />(SroyilW ') This CONSTRUCTION CONTRACT is made and entered into this 20' day of September, 2022 by and <br />P1� between the City of Santa Ana, California, a charter city and municipal corporation organized and existing <br />under the Constitution and laws of the State of California (hereinafter "CITY"), and EBS General <br />Engineering, Inc. (hereinafter "CONTRACTOR"). <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: <br />CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and <br />expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction <br />of the City Engineer of the CITY, the Flower Street Bike Trail Renovation From Crossover (South of <br />Dyer) to Warner Avenue (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in <br />and in accordance with the Contract Documents prepared by the City's Public Works Agency and <br />approved by the City Council. <br />2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard <br />Specifications for Public Works Construction and which include the following: <br />• Notice Inviting Bids <br />• Information to Bidders <br />• Bid Proposal <br />• Bid Bond <br />• Contract Form <br />• Contract Bonds <br />• General Provisions <br />• Special Provisions <br />• Technical Provisions and Project Plans <br />• Community Workforce Agreement <br />• Appendices <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF <br />IMPROVEMENT the sum total amount not to exceed One Million, Sixty -Six Thousand, Seven <br />Hundred and Fourteen Dollars and Thirty -Five Cents ($1,066,714.35), as set forth and identified in <br />the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A." <br />The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate <br />quantities only, and the City does not expressly or by implication agree that the actual amount of work <br />will correspond therewith, but reserves the right to increase or decrease the amount of any class or <br />portion of the work or to omit portions of the work as may be deemed necessary or advisable. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.