Laserfiche WebLink
Garry Avenue Business Park at 1700, 1720, and 1740 E. Garry Avenue <br />October 10, 2022 <br />Page 7 <br />2 <br />8 <br />7 <br />1 <br />ENVIRONMENTAL IMPACT <br />Pursuant to the California Environmental Quality Act (CEQA) and the CEQA Guidelines, <br />the project is exempt from further review pursuant to 15183 of the CEQA Guidelines. This <br />type of exemption analysis evaluates whether the potential environmental impacts of the <br />proposed demolition of three office buildings, which total 105,558 square feet, and <br />construction of a new 91,500 square foot light industrial warehousing building that would <br />accommodate two tenants are addressed in the City of Santa Ana General Plan Update <br />Final Recirculated Program Environmental Impact Report (GPU EIR). <br />As set forth in California Public Resources Code (PRC) Section 21083.3 and State CEQA <br />Guidelines Section 15183, projects that are “consistent with the development density <br />established by the existing zoning, community plan or general plan policies for which an <br />EIR was certified shall not require additional environmental review, except as might be <br />necessary to examine whether there are project-specific significant effects which are <br />peculiar to the project or its site” (State CEQA Guidelines Section 15183(a) and PRC <br />Section 21083.3(b)). The State CEQA Guidelines further state that “[i]f an impact is not <br />peculiar to the parcel or to the project, has been addressed as a significant effect in the <br />prior EIR, or can be substantially mitigated by the imposition of uniformly applied <br />development policies or standards […] then an additional EIR need not be prepared for <br />the project solely on the basis of that impact” (State CEQA Guidelines Section 15183(c)).” <br />The GPU was adopted, and the GPU EIR certified, in April 2022 (State Clearinghouse <br />Number 2020029087); the GPU went into effect on May 26, 2022. Any decision by the <br />City affecting land use and development must be consistent with the GPU. The GPU EIR <br />evaluates the potential environmental effects associated with implementation of the GPU <br />and addresses appropriate and feasible mitigation measures that would minimize or <br />eliminate these impacts. A project is consistent with the GPU if the development density <br />does not exceed what was contemplated and analyzed for the parcel(s) in the certified <br />GPU EIR and complies with the associated standards applicable to that development <br />density (State CEQA Guidelines Section 15183(i)(2)). Development density standards <br />can include the number of dwelling units per acre, the number of people in a given area, <br />floor area ratio (FAR), and other measures of building intensity, building height, size <br />limitations, and use restrictions. <br />The GPU identifies that the Interim Development Standard for the FLEX-3 area is M1. <br />The M1 zone provides for a variety of light industrial uses, including warehousing, <br />manufacture, assembly, machine shops, wholesale businesses. The Project would result <br />in a FAR of 0.42, which is within the projections of the GPU EIR, which evaluated a density <br />of 3.0 FAR on the site. The GPU EIR adequately anticipated and analyzed the impacts of <br />this Project, identified applicable mitigation measures necessary to reduce impacts of the <br />Project, and the Project implements the applicable mitigation measures. The Project, <br />therefore, qualifies for an exemption from additional environmental review as set forth in <br />State CEQA Guidelines Section 15183. The full exemption analysis is provided as Exhibit <br />10/10/2022 <br />Planning Commission 2 – 7