My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_10-10-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
10-10-22
>
Packet_10-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 1:11:47 PM
Creation date
11/7/2022 1:10:44 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16'-0"16'-0" <br />30'-0" DRIVEWAY <br />NO TRUCKS ALLOWED. 88" MAX. CLEARANCE 7'-4""KNOX BOX <br />NO TRUCKS ALLOWED. 88" MAX. CLEARANCE <br />N49°22'37"W 329.59' <br />& MEZZ. <br />OFFICE <br />5 <br />310 <br />9 18'-0" <br />12 <br />12'-0"18'-0"5'-0"60'-0"13 <br />USER: <br />(SEE CIVIL) FOR EASEMENT INFORMATION <br />5'-0" <br />EXISTING <br />CURB & <br />TREES <br />1 <br />A2.2 <br />14 <br />aoarchitects.com <br />714 / 639-9860 <br />144 North Orange Street, Orange, California 92866 <br />Job No. 2021-124 <br />Scale: 1" = 20-0"Greenlaw | Partners <br />GARRY AVE. BUSINESS PARK SANTA ANA, CA CONCEPTUAL ENLARGED SITE PLAN <br />A2.1 <br />Date: 09-21-2022 <br />1 <br />A2.2 BARRIER GATE ELEVATION <br />10/10/2022 <br />Planning Commission 2 – 28
The URL can be used to link to this page
Your browser does not support the video tag.