My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_9-8-22
Clerk
>
Agenda Packets / Staff Reports
>
Historic Resources Commission (2009-Present)
>
2022
>
9-08-22- Special Meeting
>
Packet_9-8-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 2:03:11 PM
Creation date
11/7/2022 1:59:43 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning and Building Agency <br />Item # 1 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Historic Resources Commission Staff Report <br />September 8, 2022 <br />Topic: HRCA No. 2022-13, HRC 2022-6, HPPA No. 2022-3 – Gibbs-Wasley House <br />RECOMMENDED ACTION <br />1. Adopt a resolution approving Historic Resources Commission Application No. 2022- <br />13 and Historic Register Categorization No. 2022-6 (Exhibit 1). <br />2. Recommend that the City Council authorize the City Manager and Clerk of the <br />Council to execute the attached Mills Act agreement with Benjamin and Catherine <br />Mayberry, subject to non-substantive changes approved by the City Manager and City <br />Attorney (Exhibit 2). <br />EXECUTIVE SUMMARY <br />Benjamin and Catherine Mayberry are requesting approval to designate an existing <br />residence located at 2405 Bonnie Brae to the Santa Ana Register of Historical <br />Properties, as well as approval to execute a Mills Act agreement with the City of Santa <br />Ana. <br />The request was originally agendized for the July 7, 2022, Historic Resources <br />Commission (HRC) meeting. However, after opening up the public hearing and <br />discussing the request, the HRC voted to continue the item to the next regular meeting. <br />The item was continued to allow the HRC time to ensure that ongoing construction on <br />the site was in keeping with the approval of Historic Exterior Modification Application <br />(HEMA) No. 2021-03, which was granted by the HRC on July 1, 2021, to allow exterior <br />modifications to the residence. The exterior modifications consisted of additions to the <br />first floor, basement, and detached garage, and the construction of a pool and spa and <br />three detached accessory structures. For reference, staff has included site photos of the <br />ongoing construction (Exhibit 4) and has included the HRC approved drawing exhibits <br />(Exhibit 5), which include the approved site plan, demolition plans, floor plans, and <br />elevations. <br /> <br />Historic Resources Commission 1 – 1 9/8/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.