My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:37:19 PM
Creation date
11/7/2022 4:04:03 PM
Metadata
Fields
Template:
Contracts
Company Name
ENVIRONMENTAL CONSTRUCTION, INC.
Contract #
P 18-6491
Agency
Public Works
Council Approval Date
11/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-6491 <br />WELL NO, 29 IMPROVEMENTS <br />WELL PWHAHILITAION <br />SCHEDULE A <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />8 <br />Perform mechanical <br />redevelopment (airlifting and <br />90 <br />HRS <br />$ <br />$ <br />swabbing)of the well. <br />9 <br />Conduct treatment and proper <br />1 <br />LS <br />$ <br />$ <br />discharge of mechanical and/or <br />pumping redevelopment fluids <br />(as applicable) via use of Balser <br />tanks and the neutralization, <br />blending, and disposal of <br />solids/sludges per specifications, <br />including treatment, sampling, <br />analysis and reporting for <br />NPDES discharge com liance. <br />10 <br />Mobilize, install and demobilize <br />1 <br />LS <br />$ 6 y,? <br />$ <br />a diesel or gasoline engine, <br />/ <br />temporary test pump, and all <br />necessary equipment and <br />accessories <br />11 <br />Perform pumping development <br />60 <br />HRS <br />$ . <br />$ <br />of the well including monitoring <br />` <br />Z <br />of water levels, flow rates and <br />l410 <br />measurement of sand content. <br />12A & 12B <br />Perform a 12-hour (maximum) <br />60 <br />HRS <br />$ <br />$ <br />step drawdown test and a <br />minimum 24-hour (maximum <br />f €, <br />Z f 5 f � <br />48-hour) constant rate pumping <br />test, including monitoring of <br />water levels, pumping rates, and <br />sand content. <br />1 <br />LS <br />$ <br />$j-m <br />13 <br />Perform flow meter (spinner) <br />5.. <br />J "1 <br />survey under dynamic (pumping) <br />j <br />conditions <br />14 <br />Conduct well disinfection and <br />1 <br />LS <br />$ <br />t�/ �� <br />$ <br />clean up site, <br />I <br />SCHEDULE A SUBTOTAL <br />$�' <br />w. -I ,'E I.J <br />WELL EQUIPPING AND SITE IMPROVEMENTS <br />SCHEDULEB <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilization, Bonds and <br />i <br />LS <br />$ V C7E.i <br />$ 2 q c'c <br />Insurance <br />o <br />2 <br />Additional Demobilization/ <br />Remobilization for Owner's <br />1 <br />LS <br />$ <br />$ <br />Convenience <br />P-2 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.