ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 9:52:59 AM
Creation date
11/7/2022 4:04:03 PM
Metadata
Fields
Template:
Contracts
Company Name
ENVIRONMENTAL CONSTRUCTION, INC.
Contract #
P 18-6491
Agency
Public Works
Council Approval Date
11/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 18-6491 Well No. 29 Improvements Change Order Number 007 <br />To Environmental Construction, Inc. <br />Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />EXTRA WORK AT AGREED PRICE <br />CITY OF SANTAANA <br />This Change Order Number 007, Item A provides additional compensation to the Contractor for <br />all items described in COR #19, Submittals No. 136 and No. 146, RFI's No. 119.11119, No. <br />102.11102 which include furnishing and installing complete in place an 8 inch and a 12 inch <br />Insertion Valves. <br />Work to be paid at agreed price in accordance with Section 7-3.7 - "Agreed Price" of the Standard <br />Specifications for Public Works Construction. <br />The total cost of Change Order Number 007, Item A ninety-six thousand, four hundred forty-six <br />and 861100 dollars ($96,446.86). This sum constitutes full and complete compensation for <br />furnishing all labor, materials, transport, equipment, tools, and incidentals including all markups <br />by reason of this Change Order Number 007, Item A. Twenty (20) additional working days are <br />added as part of this Change Order 007, Item A. <br />CHANGE ORDER NUMBER 007 ITEM A COST: $96 446.86 <br />2. This Change Order Number 007, Item B provides additional compensation to the Contractor for <br />all items described in COR #21, Submittal 4138, which include furnishing and installing complete <br />in place a 16 inch Gate Valves. <br />Work to be paid at agreed price in accordance with Section 7-3.7 - "Agreed Price" of the Standard <br />Specifications for Public Works Construction. <br />The total cost of Change Order Number 007, Item B is twenty-five thousand, nine hundred <br />seventy-five and 06/100 dollars ($25,975.06). This sum constitutes full and complete <br />compensation for furnishing all labor, materials, transport, equipment, tools, and incidentals <br />including all markups by reason of this Change Order 007, Item B. Two (2) additional working <br />days are added as part of this Change Order 007, Item B. <br />CHANGE ORDER NUMBER 007, ITEM B COST: $25,975,06 <br />Page 1 of 4 <br />