Laserfiche WebLink
RELE`/4 `IT PROJ ECT <br />ARC FLASH PROJECT EXPERIENCE <br />City of Anaheim Water Department, Arc Flash Study <br />The City of Anaheim turned to P2S for a short circuit analysis, protective device coordination and Arc Flash <br />study. The project involved visiting all 21 identified locations and collecting the appropriate data, developing <br />flash protection boundaries for each class of equipment, establishing personal protective equipment (PPE) <br />requirements for each class of equipment, and labeling for each class of equipment. The safety signage <br />included voltage shock hazard, flash hazard boundary, incident energy, PPE level, limit shock approach <br />boundary, and restricted shock approach boundary. Recommendations were compliant with NFPA 70E-2018 <br />requirements. P2S provided training to facility staff. <br />PROJECT DATES: June 2018- December 2018 <br />OWNER CONTACT: <br />Jon Sonks, Environmental Services Manager <br />714.765.4117, jsanks@ancheim.net <br />Palmdale Water District, Arc Flash Study <br />PROJECT OWNER: City of Anaheim <br />PROJECT TEAM: <br />Aravind Batra, Principal -in -Charge <br />Marco Cabibbo, PM, Electrical Engineer <br />132S provided electrical engineering services for the Palmdale Water District which included a short circuit, <br />protective device coordination, and Arc Flash Study for 23 groundwater wells and 7 booster pumping stations. <br />Recommendations were compliant with NFPA 70E-2018 requirements. P2S provided training to facility staff. <br />PROJECT DATES: August 2020- December 2022 PROJECT TEAM: <br />PROJECT OWNER: Palmdale Water District Aravind Batra, Principal -in -Charge <br />OWNER CONTACT: Marco Cabibbo, PM, Electrical Engineer <br />Scott L. Rogers, PE, Engineering Manager Aaron Chee, Power Systems Engineer <br />661.456.1020, srogers@palmdalewater.org <br />Water Facilities Authority, Arc Flash Study <br />P2S performed a comprehensive Arc Flash Analysis for the Water Facilities Authority in Upland, CA. We <br />collected the appropriate data, developed flash protection boundaries for each class of equipment, established <br />personal protective equipment (PPE) requirements for each class of equipment, and safety signage and <br />labeling for each class of equipment. The safety signage and labeling included voltage shock hazard, flash <br />hazard boundary, incident energy, PPE level, limit shock approach boundary, and restricted shock approach <br />boundary. Our recommendations met the prevailing NFPA 70E requirements, compliant with applicable OSHA <br />regulations and IEEE standards. <br />PROJECT DATES: October 2019- March 2020 PROJECT TEAM: <br />PROJECT OWNER: Upland Water Facilities Authority Aravind Batra, Principal -in -Charge <br />OWNER CONTACT: Marco Cabibbo, PM, Electrical Engineer <br />Jake Stepp, Operations Superintendent <br />909.981.9454 ext.21, jstepp@wfojpa.org <br />13 <br />