Laserfiche WebLink
Quote# Steel Plates <br />Customer: <br />Contact: <br />Phone: <br />Location: <br />Note: <br />Rental Duration: <br />Rental Quote <br />206 N Central Ave <br />Compton, CA 90220 <br />Phone: 310-327-5554 Cell: 562-822-0211 <br />From: David Noorigian <br />Date: 5/1812022 <br />Fax: <br />Email: <br />OTY EQUIPMENT DESCRIPTION WEIGHT MINIMUM DAILY WEEKLY 4 WEEK <br />EACH REM EACH EACH EACH FACH <br />1 <br />Road Plate 4' x 5' Treated <br />820 <br />1103000405 <br />$ 11.90 <br />$ 2.38 <br />$ 16.66 <br />$ 66.64 <br />1 <br />Road Plate 4' x 8' Treated <br />1,312 <br />1103000408 <br />$ 14.00 <br />$ 2.80 <br />$ 19.60 <br />$ 78.40 <br />1 <br />Road Plate 4' x 10' Treated <br />1,640 <br />1103000410 <br />$ 17.85 <br />$ 3.57 <br />$ 24.99 <br />$ 99.96 <br />1 <br />Road Plate Tx 8' Treated <br />1,640 <br />1103000508 <br />$ 15.93 <br />$ 3.19 <br />$ 22.30 <br />$ 89.18 <br />1 <br />Road Plate Tx 10' Treated <br />2,050 <br />1103000510 <br />$ 19.08 <br />$ 3.82 <br />$ 26.71 <br />$ 106.82 <br />1 <br />Road Plate 6' x 8' Treated <br />1,968 <br />1103000608 <br />$ 18.03 <br />$ 3.61 <br />$ 25.24 <br />$ 100.94 <br />1 <br />Road Plate 6' x 10' Treated <br />2.460 <br />1103000610 <br />$ 21.88 <br />$ 4.38 <br />$ 30.63 <br />$ 122.60 <br />1 <br />Road Plate 6' x 12' Treated <br />2.952 <br />1103000612 <br />$ 25.73 <br />$ 5.15 <br />$ 36.02 <br />$ 144.06 <br />1 <br />Road Plate 6' x 15' Treated <br />3,690 <br />1103000615 <br />$ 28.00 <br />$ 5.60 <br />$ 39,20 <br />$ 156.80 <br />1 <br />Road Plate 6' x 20' Treated <br />4,920 <br />1103000620 <br />$ 33.95 <br />$ 6.79 <br />$ 47.53 <br />$ 190.12 <br />1 <br />Road Plate 8'x 10'Treated <br />3,280 <br />1103000810 <br />$ 24.85 <br />$ 4.97 <br />$ 34.79 <br />$ 139.16 <br />1 <br />Road Plate 8' x 12' Treated <br />3,938 <br />1103000812 <br />$ 28.88 <br />$ 5.78 <br />$ 40.43 <br />$ 161.70 <br />1 <br />Road Plate 8' x 15' Treated <br />4,920 <br />1103000815 <br />$ 35.00 <br />$ 7.00 <br />$ 49.00 <br />$ 196.00 <br />1 <br />Road Plate 8' x 20' Treated <br />6,560 <br />1103000820 <br />$ 46.03 <br />$ 9.21 <br />$ 64.44 <br />$ 257.74 <br />1 <br />Road Plate 8' x 10' x 1-1/4" Treated <br />4,100 <br />1105000810 <br />$ 32.90 <br />$ 6.58 <br />$ 46.06 <br />$ 184.24 <br />1 <br />Road Plate 6' x 10' x 1-1/2" Treated <br />3,690 <br />1104000610 <br />$ 37.10 <br />$ 7A2 <br />$ 51.94 <br />$ 207.76 <br />1 <br />Road Plate 6' x 12' x 1-12" Treated <br />4,428 <br />1104000612 <br />$ 40.08 <br />$ 8.02 <br />$ 56.11 <br />$ 224.42 <br />1 <br />Road Plate 6' x 14' x 1-12' Treated <br />5,166 <br />1104000614 <br />$ 46.03 <br />$ 9.21 <br />$ 64.44 <br />$ 257.74 <br />1 <br />Road Plate 6' x 15' x 1-1/2" Treated <br />5,535 <br />1104000615 <br />$ 50.05 <br />$ 10.01 <br />$ 70.07 <br />$ 280,28 <br />1 <br />Road Plate 6' x 20' x 1-1 /2" Treated <br />7,380 <br />1104000620 <br />$ 62.13 <br />$ 12.43 <br />$ 86.98 <br />$ 347.90 <br />1 <br />Road Plate 8' x 10' x 1-112' Treated <br />4,902 <br />1104000810 <br />$ 38.68 <br />$ 7.74 <br />$ 54.15 <br />S 216.58 <br />1 <br />Road Plate 8' x 12' x 1-1/2" Treated <br />5,904 <br />1104000812 <br />$ 50.05 <br />$ 10.01 <br />$ 70.07 <br />$ 280.28 <br />1 <br />Road Plate B' x 15' x 1-112" Treated <br />7,380 <br />1104000815 <br />$ 58.10 <br />$ 11.62 <br />$ 81.34 <br />$ 325.36 <br />1 <br />Road Plate 8' x 20' x 1-1/2' Treated <br />9,840 <br />1104000820 <br />$ 78.40 <br />$ 15.68 <br />$ 109.76 <br />$ 439.04 <br />WEIGHT MINIMUM DAILY WEEKLY 4 WEEK <br />*NO SALES TAX ON RENTALS <br />1 TRUCK LOADS ON (DELIVERY) 1 TRUCK LOADS OFF (PICKUP) <br />$ 130.00 Per Hour Portal to Portal 0.00 HOURS PER TRUCK PORTAL TO PORTAL <br />*ESTIMATED TOTAL TRANSPORTATION (DELIVERY AND PICKUP): $ <br />Initial Above <br />*QUOTE IS VALID FOR 30 DAYS FROM DATE ISSUED AND IS SUBJECT TO CHANGE IF NOT YET AGREED. <br />'RATES WILL BE REVIEWED ANNUALLY. <br />'TOTAL TRANSPORTATION COST IS AN ESTIMATE ONLY FOR TOTAL TRUCKING INCLUDING DELIVERY AND PICKUP <br />AND MAY INCREASE OR DECREASE BASED ON TOTAL TIME INCLUDING TIME ON JOB. <br />'ENGINEERING COST IS FOR SITE SPECIFIC ENGINEERED SHORING DESIGN. <br />ENGINEERING COST IS AN ESTIMATE ONLY AND CAN VARY DEPENDING ON SITE CONDITIONS. <br />1 TSC Rental Quote - - Copy - Copy - Copy <br />PRICES ARE SUBJECT TO CHANGE WITHOUT NOTICE. Page 1 of 2 <br />