Laserfiche WebLink
Sunrise General Contracting Services, Inc. <br />232 E. 191" Street, Costa Mesa, California, 92627 951/ 830-7375 <br />Open Issue 1 <br />Easements <br />Applicant name Greenlaw vs. Garry Owners, LLC Need clarification <br />All Meets and Bounds need to be verified. Current Association has engaged a Civil Engineer to Verified. The <br />Parcels have changed ownership and have been subdivided since 1968. Without an executed Letter of <br />Agreement the Association in good faith proceeding at their cost risk. <br />Submitted Drainage Easement — Quickclaim Deed - Why is the Association releasing rights to easement to <br />Garry Owners? Developer plans not to use but the Association will continue using. Said Drainage Easement <br />is missing on Kimberly Horn Easement Schedule on C-1 exhibit. <br />Missing on Kimberly Horn Easement Schedule on C-1 exhibit is an Easement recorded August 1, 1941 in <br />favor of Southern California Telephone Company. The Association has not records of the easement and if it <br />is a risk to the Association. <br />Open Issue 2 <br />Letter of Agreement <br />Discussion: Developer to assume all cost. <br />1. Attorney fees, Construction Consultant fees, Civil fees, City fees, County Recorder's fees, Other unknown <br />Consultant fees, Unknown Construction fees <br />2. Developer is to preformed all construction scope and cost at the proposed Exclusive Access Easement <br />Deed as depicted on the Civil, Architectural and Landscaping conceptions including 1- SCE Easement on <br />the Association's Parcel. All scope is to be constructed per the UBC as to prevent the Association un-due <br />expense maintaining the Easement area. <br />3. Revised CC&Rs fees. <br />4. Air & Noise mitigating measures (Cost & scope Impact) of Building 1800 due to Parcel 1 development is to <br />be resolved. <br />5. Potential Parcel Map fees. <br />6. Unknown Build Code compliance requirements of Building & Site due to Parcel Change. Parcel <br />#2 was developed in 1978. <br />7. Civil engineering fees: Revised Parcel Map, parcel recordings, legal review, Drawings — surface <br />improvements such as Curb & Gutter / Flow lines, Asphalt, Catch Basins, Fencing, Stripping... and <br />Underground Utilities such as - Storm Water systems with SW treatment (i.e. CB, Inline, <br />building(s) runoff Water Treatment), Sewer, Fire, SCE, Phone & Internet (cable & fiber),... <br />8. Architectural & Landscape drawings fees: Improvement drawings. <br />9. City submittal Plan Check and Permit fees. <br />10. Construction costs: Asphalt & landscaping demolition, traffic control, temporary parking, known <br />and unknown underground utilities termination / rerouting / tenant disruptions. <br />11. Currently this is a Telephone Landline Pedestal the supplies both the 1700 & 1800 buildings. The <br />association request that the developer acknowledges that it's responsible maintaining service to the 1800 <br />Bldgs. during development and endures all cost maintain service at the completion of the development. <br />The Association appreciates your consideration reviewing our comments and addressing these concerns at to day's <br />City Council Meeting. Please contact myself or the Liam Stevens — Association President at 949/ 852-9892 office or <br />714/883-9893 mobile. <br />Page 2 of 3 <br />