My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-12-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Agenda Packet_2022-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 9:48:29 AM
Creation date
12/20/2022 10:03:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPAL <br />FUELS <br />07/07/2022 - Proposal No: Q-00390 <br />Quote Valid until: 12/31 /2022 <br />PRICING AND PAYMENT TERMS <br />Payment Schedule <br />• 20% down payment with order <br />• Remainder to be progress billed as work is completed and equipment <br />Qualifications <br />• Pricing is in US Dollars and is based on equipment supply <br />• Assuming expedited plan -check through the city and Fire Marshall, we could expect a station delivery <br />and commissioning within 12 months from date of order <br />• Opal Fuels' General Conditions of Supply apply to this quotation <br />• Warranty is Equipment Manufacturers standard 1-year parts only warranty; labor is excluded. <br />Schedule of Values <br />Price <br />Item <br />Engineering <br />Design and Engineering <br />$63,084.45 <br />Permitting <br />$10,200.00 <br />Equipment <br />MTS for Backup Generator <br />$33,549.08 <br />Buffer Storage <br />$128,520.00 <br />Compressors <br />$627,432.60 <br />Compound Lighting <br />$9,562.50 <br />Fast Fill <br />$205,113.09 <br />Electrical <br />$4,417.88 <br />Flow Meters <br />$28,682.40 <br />Inlet Gas Dryer <br />$117,189.08 <br />Motor Starter <br />$54,270.38 <br />Remote Monitoring <br />$9,990.90 <br />Time Fill <br />$102,210.45 <br />Defuel Panel & Hose <br />$11,880.00 <br />Construction <br />Civil <br />$1,581,457.36 <br />Electrical <br />$857,729.00 <br />Mechanical Pressures <br />$739,978.36 <br />Project Management <br />$214,200.00 <br />Commissioning <br />$32,397.75 <br />Freight <br />$17,000.00 <br />Taxes <br />$123,285.70 <br />TOTAL PRICE WITH TAXES <br />$4,972,150.98 <br />Total Price Without Applicable Taxes <br />$4,848,865.28 <br />Required Down Payment <br />$994,430.20 <br />Opal Fuels- 10225iftdelp aoConCRl ncho Cucamonga, 91730 909-793-3700 (fax) 909-793�8656 37.opalfuels.com 2/�0�2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.