Laserfiche WebLink
SERVICE AGREEMENT — ALL INCLUSIVE 100% WARRANTY <br />TruStar <br />Energy <br />Daily Inspection Report <br />Item <br />3. Gas Dryer Inspection <br />see eon�meni <br />6elaw <br />Good <br />Repair <br />NIA <br />1 <br />check Gas Dryer cantrollerfor alarms and status <br />2 <br />check for damage <br />3 <br />check Filter D'rffereMialPremireGaugeswhile running <br />q <br />check Dew Point IRecord on page 2) <br />5 <br />check Heat irate Indicator IIIr cold weather} <br />Item <br />4, Dispenser. Defuel,ing Systems and Time Fill Posts <br />See Conn• ene <br />&elow <br />Good <br />Repair <br />NfA <br />L <br />check overall condition of all fignage and Labeling in the Dispenser and Time Fill Areas <br />z <br />Check operation of all Work Lights and Flood Lights in the Dispenser and Time Fill Areas <br />3 <br />Check Fire EXtinguishers inspection date, Charge, condition, and placement around equipment compound <br />4 <br />lVisually inspect Dispenser LLD Display for defects and damage <br />5 <br />check the Dispenser for active fault codes <br />B <br />Inspect hoses, nozeles, valves and breakaways for leaks or damage <br />- <br />Inspect Nozzle conditicm/operation and dean with degreaser Spray H n�le is dirtyaroily <br />3 <br />Inspect Dispenser operation and observe vehicle fueling from Dispenser <br />9 <br />Check the Defueling Panel status for faulWalarms <br />io <br />Check the Conditionfoperation of the Defueling Hose, Breakaway Devices, Nozzle Valve and Coupler <br />11 <br />Inspect all Tim a -Fill and Direct -Fill pasts, reels, lines & connections <br />12 <br />Verity operation of arkeoff va hte on Time -Fill and Direct -fill Nozzles and lubricate nozzle with Silicone Spray <br />Lubricant if needed <br />13 <br />observe vehicle fueling fro m Time Fill station <br />14 <br />Verity Flow Meters are displaying flow on dashboard during fueling event <br />5. Leak Detection <br />f— Cammeni <br />Bela. <br />Goad <br />Repair <br />N/A <br />1 <br />AN Pre -compression lines, fittings & valves from cas meter to Dryer <br />2 <br />All Dryer connections, fittings, va Ives, flanges & filter housings <br />3 <br />Supply lines fro In Dryer toCorn pressors <br />d <br />All connections, fittings, walwes & filter housings inside compresmr enclosure <br />S <br />Supply lines to Priority Panel <br />B <br />All connectionsr fittings &vaIves inside Buffer{priority Panel <br />7 <br />Supply lines, fittings & va fires before and after Buffer storage <br />B <br />Post compression filter housings <br />all Dispener, Defuel Panel, Time Fill and Direct Fill lines, connections, & fittings <br />& Oil Replenishment <br />Ter Comment <br />Below <br />5 Gal <br />30 Gal <br />55 Ga I <br />_ ❑Des site need oil replenished? [ ] No [ ] Yes - check Callan size and request quote <br />Comments: <br />IEnter Section # and Item # before each comment] <br />10225 Philadelphia Court One North Lexington Ave 35577{0�g8c11st Street NW <br />Ranch I ym �aund ie Pins, 1 — 67 12/ U/LU 55960 <br />