Award Construction Contract to EverLevel Holdings, LLC <br />December 20, 2022 <br />Page 3 <br />A total of two bids were received, both of which were deemed responsive. EverLevel <br />Holdings, LLC. submitted the lowest responsive base bid in the amount of $4,482,892 <br />(Exhibit 2). As specified in the bid documents, the lowest bid shall be determined by the <br />Base Bid. <br />In the past five years, EverLevel Holdings, LLC. has not performed any work for the City. <br />Based on the bid analysis and a contractor reference check, staff recommends awarding <br />the construction contract to EverLevel Holdings, LLC. in the amount of the Base Bid, <br />totaling $4,482,892 (Exhibit 3). <br />Proiect Delive <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen conditions. <br />Construction administration and inspection includes construction management, <br />implementation of the City's Community Workforce Agreement requirements, inspection <br />of the Contractor's work to ensure contract compliance, workmanship and quality, and <br />materials testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized in the <br />table below, the estimated total construction delivery cost of the project is $5,600,000. <br />Project Item <br />Total <br />Construction Contract <br />$ <br />4,482,892.00 <br />Construction Administration, Inspection, Testing <br />$ <br />667,108.00 <br />Contingencies <br />$ <br />450,000.00 <br />TOTAL CONSTRUCTION DELIVERY COST <br />$ <br />5,600,000.00 <br />On August 2, 2022, the Santa Ana City Council approved the Revive Santa Ana Spending <br />Plan that included a $5,000,000 allocation of American Rescue Plan Act (ARPA) funds <br />for the First Street Pedestrian Safety Project. Subsequently, $600,000 was reallocated <br />from the Addition of Park/Open Space ARPA project to close the funding gap for this <br />project. Approval of the amendment to the FY 2022-23 Capital Improvement Program <br />(Exhibit 5) will officially incorporate the additional funding for the project into the CIP <br />program. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2021-119 was filed for the project. <br />FISCAL IMPACT <br />The total estimated construction delivery cost of $5,600,0000, which includes <br />construction, contract administration, inspection, testing, and an authorized contingency. <br />City Council 17 — 3 12/20/2022 <br />