My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-12-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Agenda Packet_2022-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 9:48:29 AM
Creation date
12/20/2022 10:03:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Davis Elementary SRTS <br />(PROJECT CATEGORY: <br />Traffic Improvements - <br />Traffic Safety/Mobility <br />LOCATION MAP <br />a^ <br />Aye p z <br />ti <br />SANTA ANA <br />W14thst TRIANGLE <br />W 17th St F 17th St <br />tJl <br />c <br />a $ <br />FRENCH <br />E PARK <br />1'ii9 34 <br />CITY OF SANTA ANA CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Installation of bulb -outs at crossings adjacent to Davis <br />Elementary, reconstruction and installation ofADA <br />compliant curb ramps, sections of sidewalk and <br />driveways along the safe routes to school (SRTS). <br />EXHIBIT 2 <br />PROJECT NEED: <br />Project is designed to increase pedestrian safety and <br />mobility. <br />PROJECT COSTS <br />FY 19/20 FV 20/21 <br />FY 21/22 FY 22/23 FV 23/24 FV 24/25 FV 25/26 <br />Construction <br />$4,834,000 <br />$ 2,114,025 <br />TOTAL <br />$4,834,000 <br />$ 2,114,025 <br />SOURCE OF FUNDS <br />FV 19/20 FY 20/21 <br />FY 21/22 FY 22/23 FV 23/24 FY 24/25 FV 25/26 <br />ARPA <br />$ 2,114,025 <br />ATP <br />$4,834,000 <br />TOTAL <br />$4,834,000 <br />$ 2,114,025 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency CIP Engineering Jason Gabriel, Principal Civil Engineer 02-Dec-2022 <br />-1- <br /> <br />City Council <br /> 18 – 6 <br />12/20/2022 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.