My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-12-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Agenda Packet_2022-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 9:48:29 AM
Creation date
12/20/2022 10:03:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/14/22, 1:45 PM SAM.gov <br />Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine <br />Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB <br />$4.00 additional per hour at the following locations: <br />Army Defense Language Institute - Monterey, Fallon Air Base, <br />Naval Post Graduate School - Monterey, Yermo Marine Corps <br />Logistics Center <br />$2.00 additional per hour at the following locations: <br />Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock <br />---------------------------------------------------------------- <br />* LAB00300-005 08/01/2022 <br />Rates Fringes <br />Asbestos Removal Laborer ......... $ 39.23 23.28 <br />SCOPE OF WORK: Includes site mobilization, initial site <br />cleanup, site preparation, removal of asbestos -containing <br />material and toxic waste, encapsulation, enclosure and <br />disposal of asbestos- containing materials and toxic waste <br />by hand or with equipment or machinery; scaffolding, <br />fabrication of temporary wooden barriers and assembly of <br />decontamination stations. <br />---------------------------------------------------------------- <br />LAB00345-001 07/01/2022 <br />Rates Fringes <br />LABORER (GUNITE) <br />GROUP 1.....................$ 48.50 21.37 <br />GROUP 2.....................$ 47.55 21.37 <br />GROUP 3.....................$ 44.01 21.37 <br />FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a <br />Bosn'n's Chair or suspended from a rope or cable shall <br />receive 40 cents per hour above the foregoing applicable <br />classification rates. Workers doing gunite and/or <br />shotcrete work in a tunnel shall receive 35 cents per hour <br />above the foregoing applicable classification rates, paid <br />on a portal-to-portal basis. Any work performed on, in or <br />above any smoke stack, silo, storage elevator or similar <br />type of structure, when such structure is in excess of <br />75'-0"" above base level and which work must be performed in <br />whole or in part more than 75'-0"" above base level, that <br />work performed above the 75'-0"" level shall be compensated <br />for at 35 cents per hour above the applicable <br />classification wage rate. <br />GUNITE LABORER CLASSIFICATIONS <br />GROUP 1: Rodmen, Nozzlemen <br />GROUP 2: Gunmen <br />GROUP 3: Reboundmen <br />---------------------------------------------------------------- <br />* LAB00652-001 07/01/2022 <br />Rates Fringes <br />LABORER (TUNNEL) <br />GROUP 1.....................$ 45.68 23.30 <br />GROUP 2 aF -AA ?_-gA <br />GROUP 30. ity.COt1;1Cil. • • • • • • •$ 46.46 23.30 18 - 34 12/20/2022 <br />GROUP 4.....................$ 47.15 23.30 <br />https://sam.gov/wage-determination/CA20220024/12 14/22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.