My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-12-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Agenda Packet_2022-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 9:48:29 AM
Creation date
12/20/2022 10:03:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/14/22, 1:45 PM <br />GROUP 3.....................$ 45.21 21.32 <br />GROUP 4.....................$ 46.95 21.32 <br />SAM.gov <br />LABORERS - STRIPING CLASSIFICATIONS <br />GROUP 1: Protective coating, pavement sealing, including <br />repair and filling of cracks by any method on any surface <br />in parking lots, game courts and playgrounds; carstops; <br />operation of all related machinery and equipment; equipment <br />repair technician <br />GROUP 2: Traffic surface abrasive blaster; pot tender - <br />removal of all traffic lines and markings by any method <br />(sandblasting, waterblasting, grinding, etc.) and <br />preparation of surface for coatings. Traffic control <br />person: controlling and directing traffic through both <br />conventional and moving lane closures; operation of all <br />related machinery and equipment <br />GROUP 3: Traffic delineating device applicator: Layout and <br />application of pavement markers, delineating signs, rumble <br />and traffic bars, adhesives, guide markers, other traffic <br />delineating devices including traffic control. This <br />category includes all traffic related surface preparation <br />(sandblasting, waterblasting, grinding) as part of the <br />application process. Traffic protective delineating system <br />installer: removes, relocates, installs, permanently <br />affixed roadside and parking delineation barricades, <br />fencing, cable anchor, guard rail, reference signs, <br />monument markers; operation of all related machinery and <br />equipment; power broom sweeper <br />GROUP 4: Striper: layout and application of traffic stripes <br />and markings; hot thermo plastic; tape traffic stripes and <br />markings, including traffic control; operation of all <br />related machinery and equipment <br />---------------------------------------------------------------- <br />LAB01414-001 08/03/2022 <br />Rates Fringes <br />LABORER <br />PLASTER CLEAN-UP LABORER....$ 38.92 23.32 <br />PLASTER TENDER ..............$ 41.47 23.32 <br />Work on a swing stage scaffold: $1.00 per hour additional. <br />---------------------------------------------------------------- <br />PAIN0036-001 07/01/2020 <br />Rates Fringes <br />Painters: (Including Lead <br />Abatement) <br />(1) Repaint (excludes San <br />Diego County) ...............$ 29.59 17.12 <br />(2) All Other Work..........$ 33.12 17.24 <br />REPAINT of any previously painted structure. Exceptions: <br />work involving the aerospace industry, breweries, <br />commercial recreational facilities, hotels which operate <br />commercial establishments as part of hotel service, and <br />sports facilities. <br />---------------------------------------------------------------- <br />PAIN0036-008 10/01/2021 <br />Rates Fringes <br />DRYWALL FINTSHFR/TAPFR& aq_Fq 77.9? <br />------------ eity-Bound---------------------------------- 1$� 37 12/20/2022 <br />PAIN0036-015 0/01/2020 <br />https://sam.gov/wage-determination/CA20220024/12 17122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.