My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC. (3)
Clerk
>
Contracts / Agreements
>
L
>
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:27:38 AM
Creation date
12/22/2022 3:11:45 PM
Metadata
Fields
Template:
Contracts
Company Name
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Contract #
A-2022-236
Agency
Public Works
Council Approval Date
12/6/2022
Expiration Date
12/5/2025
Insurance Exp Date
7/2/2024
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AESCO <br />Proposal No. P7281 <br />the start of field work. A private utility locator will also be used to determine the location of <br />underground utilities. <br />Drilline Operations <br />Borings will be backfilled with bentonite and will be patched to match the existing surfaces as <br />needed. The boring locations will be based on site accessibility and the location of <br />underground utilities. Excess cuttings will be drummed and removed from site. <br />The borings will be logged and representative soil samples will be obtained at selected depths <br />and at changes of soil stratum. <br />Laboratory Analyses <br />Laboratory testing will be performed on representative soil samples to evaluate their <br />engineering properties and corrosivity potential. Laboratory test results will be included on <br />the boring logs and within the geotechnical report. <br />Engineering Analysis and Report Preparation <br />Our geotechnical engineering analysis will be based on the results of our investigation. We <br />will provide signed and sealed copies of a written report that includes the following: a brief <br />description of the proposed project; a site location map showing boring locations; a <br />description of the field investigation and laboratory testing; the laboratory test results; boring <br />logs; soil profile; historic and seasonal depth to groundwater; liquefaction analyses; <br />foundation recommendations; and earthwork recommendations. <br />For scheduling purposes of the geotechnical engineering services, AESCO envisions two days <br />for the drilling and field work, two weeks for the laboratory analyses, and two to three weeks for <br />the engineering report, a total of four to six weeks until completion of the report. <br />The detailed cost estimate is provided in Exhibit A. This cost estimate does not include the cost <br />of any permits that may be required. <br />If you need further assistance regarding this matter, please give us a call. We look forward to <br />hearing from you. <br />lily yours, <br />nc. <br />l i <br />Chnmail, <br />(vTSC . P.E., G.E. Dc ra Perez <br />:cring Manager Project Manager <br />Construction Material Testing/Inspection ♦ Environmental 0 Geotechnical Engineering Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.