Laserfiche WebLink
EXHIBIT A <br />Conditions of Approval for Conditional Use Permit No. 2022-14 <br />Conditional Use Permit No. 2022-14 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the California Building Standards <br />Code and all other applicable regulations. <br />The Applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this conditional use permit. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />The Applicant must comply with all conditions and requirements of the <br />Development Review Committee for the Development Project (DP No. 2021-18). <br />2. The proposed facility shall be maintained as per approved plans and any existing <br />landscaping shall be enhanced and well maintained. Any damage to existing <br />structures, walls, parking areas, or landscaping must be repaired. <br />3. All activities shall be conducted entirely within the interior of the building. Outdoor <br />activities shall be prohibited unless otherwise permitted by the City of Santa Ana <br />or per Santa Ana Municipal Code Section 41-195.5. <br />4. Outdoor storage must be screened by solid walls, pursuant to Santa Ana Municipal <br />Code Section 41-473. <br />5. The idling of trucks and passenger vehicles on and. in the vicinity of the property, <br />including on adjacent streets, is prohibited. <br />6. Contact information for an onsite manager or other individual responsible for the <br />daily operations of the facility shall be posted in a prominent location at the front <br />entry in the event that noise, traffic, and/or parking complaints need reporting. <br />7. Administrative offices shall not be subleased for uses not related to the <br />warehousing and distribution facility. <br />8. Prior to issuance of a building permit for above -ground construction, the applicant <br />shall record a parking and access easement allowing use of the eight (8) proposed <br />parking spaces at the southeast portion of the project site by the adjacent property <br />at 1800 East Garry Avenue (APN: 430-171-09). <br />Resolution No. 2022-107 <br />Page 9 of 11 <br />