Laserfiche WebLink
BOA Architecture <br />Relevant Experience <br />BACKS COMMUNITY CENTER, ADA Compliance <br />Client: City of Placentia Contact: Luis Estevez, Director of Public Works Construction Completed: Oct. 2017 <br />Architect Team: Edward Lok Ng, Leo Arteaga Construction Cost: $300,000 CDBG funds <br />Project Description: BOA was responsible for ADA compliance <br />to this 8,000 sq f.t. community center/senior center. Work <br />included, accessible ramp, accessible parking, new walkways <br />and sidewalk repair, stairs retrofit, new guardrails/handrails, <br />restroom totally renovated, door and door hardware, and new <br />drinking fountains. BOA creatively deleted the non -accessible <br />front entry ramp to form an ADA compliant sloping entry ramp. <br />The restrooms were very tight to begin with. BOA was able to <br />make the restrooms ADA compliant without deleting any <br />plumbing fixtures, as all the fixtures were needed for special <br />events. <br />BEFORE, non-ADA compliant sloping ramp <br />BEFORE, non-ADA compliant restrooms <br />ADA retrofit of stairs and new ramp at the right side <br />AFTER, new ADA compliant entry ramp <br />AFTER, totally new ADA compliant restrooms <br />