Laserfiche WebLink
FEE PROPOSAL <br />City of Santa Ana PAAL ADA Restroom Upgrades <br />date: Nov. 7, 2022 updated Construction Cost Est: to be determined <br />for: Citv of Santa Ana prepared by: BOA Architecture, Edward Lok <br />kick-off meeting to verify scope of work, obtain s-built dwgs. <br />3 hrs <br />150 <br />450 <br />project management, confirm costtwork plan & prep field work <br />3 his <br />150 <br />450 <br />site assessment, measurements & photos <br />3 hrs <br />100 <br />300 <br />meeting or coordination with Client <br />2 hrs <br />150 <br />300 <br />CADD - 3D modeling; as -built drawings <br />6 hrs <br />100 <br />600 <br />2,100 <br />ARCHITECTURAL SCHEMATIC DESIGN <br />floor plan design <br />10 hrs <br />150 <br />1.500 <br />CADD - 3D modeling <br />10 hrs <br />100 <br />1,000 <br />project management, input from owner&subconsultants <br />6 hrs <br />150 <br />900 <br />construction cost estimate <br />4 hrs <br />150 <br />600 <br />4,000 <br />SUB -CONSULTANTS and EXPENSES <br />structural engineering <br />4,000 <br />mechanical <br />2,000 <br />plumbing engineering <br />2,000 <br />electrical engineering <br />1,0005,500 <br />Asbestos -Lead paint hazardous materials report <br />photocopies, large size prints, travel, delivery <br />200 <br />14,700 <br />ARCHITECTURAL CONSTRUCTION DOCUMENTS <br />CADD - 3D modeling <br />34 his <br />100 <br />3,400 <br />refine design of floor plans, interior, special details <br />10 hrs <br />150 <br />1,500 <br />project management <br />6 hrs <br />150 <br />900 <br />meeting or coordination with Client <br />6 hrs <br />150 <br />900 <br />specifications in CSI format <br />6 hrs <br />150 <br />900 <br />construction cost estimate <br />4 hrs <br />150 <br />600 <br />quality control <br />10 hrs <br />150 <br />1,500 <br />client/blda dent dent submittal and corrections to comments <br />14 hrs <br />100 <br />1,400 <br />TOTAL DESIGN FEE: $31,900 <br />CONSTRUCTION SUPPORT (AS -NEEDED BASIS) <br />Bidding Assistance, pre -bid meeting 6 hrs 150 900 <br />construction meeting(s) 8 hrs 150 1,200 <br />Respond to RFI and technical assistance 10 hrs 150 1,500 <br />CONSTRUCTION SUPPORT FEE: $3,600 <br />TOTAL DESIGN & CONSTRUCTION SUPPORT FEE: $35,500 <br />NOTES AND RESTRICTIONS mil^ <br />1. Scope of Work limited to that stated in BOA's RFP response. ll�'� e <br />2. BOA will provide blueprints for submittals to Bldg & Safety Dept.. T�✓ J7 V- <br />3. The Client will provide, as much as possible, accurate as -built dwgs. & locations of all utilities. <br />4. BOA will be responsible for procurement of an asbestos/environmental report as directed by Client. <br />