Laserfiche WebLink
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The King Street Urban Greening Project features the transformation <br />of approximately 9,000 square-feet of unused public space at the <br />intersection of King Street and 10th Street. The Project includes <br />bicycle and pedestrian pathways, drought tolerant landscaping, <br />lighting, waste receptacles, seating, interpretive signage, art <br />installations, and a stormwater infiltration system that will capture <br />and infiltrate stormwater runoff form the surrounding neighborhood. <br />PROJECT NEED: <br />The abandoned street area at the intersection of King Street and 10th <br />Street is unused and is subject to illegal dumping. The Project will <br />beautify this public space and provide benefits to the surrounding <br />community. The Project will also help improve water quality, enhance <br />local water supply, and reduce flooding via the infiltration of stormwater <br />runoff . The Project connects the Artesia Pilar neighborhood to Fairview <br />Street via the installation of pedestrian and bicycle pathways. <br />PROJECT TITLE: <br />King Street Urban Greening Project <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Storm Drain/Water Quality <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Craig Foster, NPDES Manager 13-Dec-2022 <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 1,343,240 ------ <br />Engineering 148,000 ------ <br />TOTAL 1,491,240 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />PWA ENTERPRISE CAPITAL <br />GRANT <br />1,491,240 ------ <br />TOTAL 1,491,240 ------ <br /> <br />City Council 12 – 12 1/17/2023 <br />