Laserfiche WebLink
7. Time & Material Work related to jetting existing sewer main for blockages from 3/13/23 <br />— 6/15/23 (PCO #15). <br />AGREED PRICE: $13,028.24 <br />8. Additional 6" PCC on South Washington Ave and Parton St (PCO #16). <br />AGREED PRICE: $5,068.80 <br />9. Additional Striping within the Willard Neighborhood (PCO #17). <br />AGREED PRICE: $8,146.00 <br />10. Time & Material Work related to 2-inch Water Service Install (PCO #18). <br />AGREED PRICE: $19,586.73 <br />EXTRA WORK AT AGREED UNIT PRICE <br />11. Delete bid items 19 and 20 for Asphalt Concrete and Cold Mill (2") <br />ESTIMATED ESTIMATED <br />ITEM# DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT <br />19 Asphalt Concrete 130 TN $250.00 ($32,500.00) <br />20 Cold Mill (2") 1,500 SF $5.00 ($7,500.00) <br />ESTIMATED TOTAL = ($40,000) <br />TOTAL AGREED CHANGE ORDER COST: $219,316.10 <br />TOTAL AGREED CONTRACT INCREASE COST: $179,316.10 <br />Page 2 of 3 <br />