Laserfiche WebLink
O OPAL <br />V FUELS <br />TIME FILL/FAST FILL STATION EQUIPMENT OVERVIEW <br />07/07/2022 - Proposal No: Q-00390 <br />Quote Valid until: 12/31 /2022 <br />DESIGN AND ENGINEERING (to be performed by Opal Fuels) <br />Opal Fuels will initially meet to understand the requirements of your proposed station. At Opal Fuels's discretion <br />Opal Fuels will provide exhibit drawings. The design will be based off the conceptual layout for the location. <br />Upon signed agreement and 20% down payment, a final design will include PE -stamped CAD drawings for <br />each phase of the project, including but not limited to: electrical, mechanical and civil for permitting purposes. <br />Opal Fuels will acquire all permits necessary for complete build in all phases of construction. <br />Design and construction will consider industry standards and all executable local, State, and/or Federal <br />building codes as interpreted by the Fire Marshall and/or building inspector with regional jurisdiction. <br />PROJECT MANAGEMENT <br />A dedicated project manager is assigned to each project for the duration of the project. The assigned project <br />manager is involved with the project from the design phase throughout the construction and startup. The <br />project manager will be 100% responsible for all of the daily activity at the job site and will report construction <br />progress to the customer's designated contact on a weekly basis. This project manager is responsible to ensure <br />that all Opal Fuels employees and subcontractors follow Opal Fuels and Customer safety and site policies. The <br />project management fee includes site equipment mobilization, Opal Fuels employee travel & lodging and <br />project management. <br />START UP LABOR <br />Includes certified equipment technician on site for four days, on site operations and maintenance training and <br />one site follow-up visit by technician in first six months after start up. <br />UTILITY EXTENSIONS REQUIRED BY CUSTOMER <br />• A single High Speed Broadband Internet (RJ45) connection for CP-400 Communication (3MB minimum - <br />7MB optimal) package is required at the compressor staging area. <br />• A second phone line is required for customers using a gas broker for a telemetric meter. <br />• A third High Speed Broadband Internet (RJ45) connection (3MB minimum - 7MB optimal) is required for <br />customers using a credit card reader for public fuel dispensing or private fleet information collection. <br />Electrical Service <br />• A 800 amp electrical service is required at the compressor staging area from your Electric Utility provider <br />- 277/480, 3 phase 4-wire service. <br />Natural Gas Service <br />• 30 psi pressure capable of delivering 53280 cubic feet of natural gas per hour, with the gas meter <br />located at the compressor staging area. Note: (lower pressures can be acceptable for the production <br />of CNG at the designated site location. Lower pressures will drop the hourly production rate of CNG). <br />The customer is responsible to provide all electrical, phone and gas service as required within 25 feet of the <br />compressor compound and responsible for all associated costs. Opal Fuels will work with your local utilities to <br />validate existing service and determine what necessary upgrades are required to satisfy utilities requirements. <br />Opal Fuels - 10225 Philadelphia Court, Rancho Cucamonga. 91730 1 909-793-3700 1 ffax) 909-793-8056 1 �.opalfue6.com <br />