My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRANS (9)
Clerk
>
Contracts / Agreements
>
C
>
CALTRANS (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:43:57 PM
Creation date
2/14/2023 4:38:21 PM
Metadata
Fields
Template:
Contracts
Company Name
CALTRANS
Contract #
A-2021-124-01
Agency
Public Works
Council Approval Date
7/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12-ORA-0-SA <br />ATPSB1 L-5063(195) <br />SPECIAL COVENANTS OR REMARKS <br />Q. This PROJECT has received funds from Active Transportation Program (ATP). The <br />ADMINISTERING AGENCY agrees to administer the project in accordance with the CTC <br />Adopted SB1 Accountability and Transparency Guidelines. <br />2. A. ADMINISTERING AGENCY shall conform to all State statutes, regulations and procedures <br />(including those set forth in the Local Assistance Procedures Manual and the Local <br />Assistance Program Guidelines, hereafter collectively referred to as "LOCAL ASSISTANCE <br />PROCEDURES") relating to the federal -aid program, all Title 23 Code of Federal Regulation <br />(CFR) and 2 CFR Part 200 federal requirements, and all applicable federal laws, regulations, <br />and policy and procedural or instructional memoranda, unless otherwise specifically waived <br />as designated in the executed project -specific PROGRAM SUPPLEMENT. <br />B. Invoices shall be formatted in accordance with LOCAL ASSISTANCE PROCEDURES. <br />C. ADMINISTERING AGENCY must have at least one copy of supporting backup <br />documentation for costs incurred and claimed for reimbursement by ADMINISTERING <br />AGENCY. ADMINISTERING AGENCY agrees to submit supporting backup documentation <br />with invoices if requested by State. Acceptable backup documentation includes, but is not <br />limited to, agency's progress payment to the contractors, copies of cancelled checks showing <br />amounts made payable to vendors and contractors, and/or a computerized summary of <br />PROJECT costs. <br />D. Indirect Cost Allocation Plan/Indirect Cost Rate Proposals (]CAP/ICRP), Central Service <br />Cost Allocation Plans and related documentation are to be prepared and provided to STATE <br />(Caltrans Audits & Investigations) for review and approval prior to ADMINISTERING AGENCY <br />seeking reimbursement of indirect costs incurred within each fiscal year being claimed for <br />State and federal reimbursement. ICAPs/ICRPs must be prepared in accordance with the <br />requirements set forth in 2 CFR, Part 200, Chapter 5 of the Local Assistance Procedural <br />Manual, and the ICAP/ICRP approval procedures established by STATE. <br />E. STATE will withhold the greater of either two (2) percent of the total of all federal funds <br />encumbered for each PROGRAM SUPPLEMENT or $40,000 until ADMINISTERING <br />AGENCY submits the Final Report of Expenditures for each completed PROGRAM <br />SUPPLEMENT PROJECT. <br />F. Payments to ADMINISTERING AGENCY for PROJECT -related travel and subsistence <br />(per diem) expenses of ADMINISTERING AGENCY forces and its contractors and <br />subcontractors claimed for reimbursement or as local match credit shall not exceed rates <br />authorized to be paid rank and file STATE employees under current State Department of <br />Personnel Administration (DPA) rules. If the <br />Program Supplement 00-289S-S24-R1- SERIAL Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.