Laserfiche WebLink
NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL PROMISES AND <br />COVENANTS CONTAINED HEREIN, THE CITY AND OWNER AGREE AS FOLLOWS: <br />SECTION 1. RECITALS. The Recitals above are true and correct and incorporated into <br />the body of this Agreement by this reference. <br />SECTION 2. COMPLIANCE WITH APPROVED DEVELOPMENT PLANS AND <br />CITY CONDITIONS. This Agreement fulfills the requirement set forth in Section 9(i) of the <br />Specific Development Plan No. 94 for the Project. Owner accepts and shall fulfill all conditions <br />of approval set forth in City Council Resolution No. 2019-048 and City Council Ordinance NS- <br />2968. The Project shall substantially conform with the Development Project Application and the <br />plans contained therein, which are on file with the City Planning and Building Agency. <br />SECTION 3. PROPERTY MAINTENANCE ENFORCEMENT BY THE CITY OF <br />SANTA ANA. <br />A. Ongoing Operational/ Maintenance Conditions. Owner, on behalf of itself., its <br />successors and assigns and any owner of the Property, hereby agrees to maintain and repair the <br />following elements of the Property and the Project: <br />1. The Property shall be maintained in conformance with the standards generally applicable <br />to comparable multi -family residential developments located within the City. The Project <br />shall comply with operational conditions of the Santa Ana Municipal Code (SAMC) <br />applicable during any period(s) of construction or major repair (e.g., proper screening and <br />securing of the construction site; implementation of proper erosion control, dust control <br />and noise mitigation measure; adherence to approved project phasing, etc.). <br />2. The Project shall comply with (a) ongoing operational conditions, requirements, and <br />restrictions, as applicable, imposed by the City Council, as listed in City Council <br />Resolution No. 2019-048 and Ordinance NS-2968, respective to the project's entitlements <br />and (b) applicable state and/or federal statutes and regulations regarding the appropriate <br />operating guidelines for certain equipment (e.g., emissions standards, radio frequency <br />emissions standards, etc.). <br />3. All onsite activities shall comply with the City of Santa Ana Noise Ordinance at all times <br />4. The Property shall be in ongoing compliance with the approved design and construction <br />parameters, signage parameters and restrictions as well as landscape designs, as applicable. <br />5. Ongoing maintenance, repair and upkeep of the Property and all improvements located <br />thereupon shall be provided by the Owner (including but not limited to controls on the <br />proliferation of trash and debris about the Property; the proper and timely removal of <br />graffiti; the timely maintenance, repair and upkeep of damaged, vandalized and/or <br />weathered buildings, structures and/or improvements; the timely maintenance, repair and <br />upkeep of exterior paint, parking striping, pedestrian pathways/open space areas, lighting <br />and irrigation fixtures, walls and fencing, publicly accessible bathrooms and bathroom <br />fixtures, landscaping and related landscape improvements and the like, as applicable). <br />