My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-03-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Agenda Packet_2023-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:45:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/7/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
559
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 2 <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6017 <br />SADDLEBACK VIEW NEIGHBORHOOD STREET LIGHTING <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: International Line Builders, Inc. dba ILB Electric <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Install Street Light Pole <br />23 <br />EA <br />$ L119,15.00 <br />$159't'5& j. <br />2 <br />Install Electrical Meter Pedestal <br />2 <br />EA <br />$ t,33 xv <br />$1 l U u %.00 <br />3 <br />* Install 3#8 AWG Conductor <br />Wires <br />5500 <br />LF <br />$ U U095 <br />$3tp,�j}�j.00 <br />4 <br />* Install 2" PVC Conduit <br />5400 <br />LF <br />$ 5ci .60 <br />S3 6W - 00 <br />5 <br />* Install 3" PVC Conduit <br />50 <br />LF <br />$106-W <br />$5iarpo cc <br />6 <br />* Install No. 3 1/2 Pull Box <br />10 <br />EA <br />$ t'Os l .00 <br />$10'5go-co <br />7 <br />Install No. 5 Pull Box <br />2 <br />EA <br />$ 1,3kjq ,00 <br />$a,tygk.u0 <br />8 <br />* Remove and Replace Concrete <br />Pad <br />100 <br />SF <br />$ t46, <br />$t-i 65A,.00 <br />9 <br />Pothole Street Light Pole Location <br />23 <br />EA <br />S1,E3U.U0 <br />S-16; .Uo <br />10 <br />Pothole Utilities Not Shown on Plan <br />5 <br />EA <br />$ �+l .vo <br />$ b1,al.415.010 <br />I 1 <br />Construction Permit <br />I <br />LS <br />$6,200 <br />$ L9,a00.00 <br />City Council ` 1 — 6 3/7/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.