My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-03-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Agenda Packet_2023-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:45:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/7/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
559
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6995 <br />BRISTOL ST AND SANTA CLARA AVE TRAFFIC SIGNAL MODIFICATION <br />FEDERAL PROJECT NO.: HSIPL 5063(204) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Elecnor Belco Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Modification <br />1 <br />LS <br />$ <br />$ <br />ZG,3,000 <br />24.3,E <br />2 <br />Install Video Detection System at <br />Bristol St Santa Clara Ave <br />1 <br />LS <br />$ <br />yZ,goo <br />$ <br />yZI300 <br />and <br />3 <br />* Install 2" PVC Conduit per Plan <br />100 <br />LF <br />$ <br />$ <br />'7� <br />7.000 <br />4 <br />* Install 3" PVC Conduit per Plan <br />100 <br />LF <br />$ <br />$ <br />100 <br />10,000 <br />5 <br />* Install 4" PVC Conduit per Plan <br />500 <br />LF <br />S� <br />S <br />y D, 000 <br />6 <br />* Install No. 6 Pull Box <br />6 <br />EA <br />$I,ZOrJ <br />7 <br />* Install No. 6E Pull Box <br />2 <br />EA <br />$sgs <br />' <br />$ 110 <br />' <br />8 <br />* Remove and Replace Concrete <br />100 <br />SF <br />$ <br />$ <br />Sidewalk <br />o .50 <br />(0q 50 <br />9 <br />Cold Mill (2") <br />5900 <br />SF <br />$ <br />$(p <br />5 <br />ZZS <br />10 <br />Asphalt Rubber Hot Mix (ARHM) <br />74 <br />TN <br />$ <br />703•24 <br />11 <br />Temporary Overhead Wiring at <br />1 <br />LS <br />$ <br />$ <br />Bristol St and Santa Clara Ave <br />t(v'soo <br />((p' S00 <br />12 <br />Pothole Pole Locations for Utility <br />Conflicts <br />8 <br />EA <br />$ �� <br />$�' g� <br />13 <br />Pothole Utility Not Shown on Plans <br />4 <br />EA <br />$ <br />Q SO <br />$ <br />400 <br />IV] <br />P-1 of 2-16 <br />City Council 12 — 8 3/7/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.