My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-03-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/21/2023 Special and Regular
>
Agenda Packet_2023-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 2:26:10 PM
Creation date
3/15/2023 2:04:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
3/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1002
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Synthetic Turf for Dan Young Sports Complex <br />March 21, 2023 <br />Page 2 <br />Staff recommends the use of FieldTurf USA and has included the proposal detailing this <br />specific project scope (Exhibit 3). As part of the purchase, maintenance equipment is <br />included and will be used to maintain the synthetic turf fields at Dan Young Sports <br />Complex. Additionally, the purchase includes a 10-year warranty for both fields. <br />FISCAL IMPACT <br />The proposed cost of the project is $2,610,823.50 which includes removal of existing <br />fields, purchase and installation of new synthetic turf, and painting of all sports lines. <br />The total delivery cost including contingency and construction engineering is estimated <br />to be $3,320,859, which will be reflected in the amended FY 2022-23 CIP Sheet (Exhibit <br />4). Cannabis Public Benefit Funds ($1,002,229) were reallocated from Splash Pad <br />Projects in order to cover the funding gap. <br />Project Item <br />Total <br />FieldTurf USA Purchase Order <br />$2,675,859 <br />Contingency <br />$295,000 <br />Construction Engineering <br />$350,000 <br />Total Project Delivery Cost <br />$3,320,859 <br />Funding is available in the FY 2022-23 budget and funding for subsequent fiscal years <br />will be included in the proposed budgets for City Council consideration. <br />Accounting <br />Accounting Unit - <br />Fiscal <br />Unit - Account <br />Fund <br />Account No. <br />Amount <br />Year <br />No. <br />Description <br />Description <br />Project No. <br />PRCSA Youth <br />2022- <br />01213020-66220 <br />Cannabis Public <br />Services - <br />$3,020,859 <br />2023 <br />(22-2766) <br />Benefit Fund <br />Improvements Other <br />Than Building <br />2022- <br />05113263-66220 <br />Capital Outlay <br />Park Improvements - <br />Improvements Other <br />$300,000 <br />2023 <br />(22-2766) <br />Fund <br />Than Building <br />TOTAL <br />$3,320,859 <br />EXHIBIT(S) <br />1. Location Map <br />2. FieldTurf USA Contract with Sourcewell <br />3. FieldTurf USA Proposal <br />4. Amended CIP Sheet FY 2022-23 <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Kristine Ridge, City Manager <br />City Council 12 — 2 3/21/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.