My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-03-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/21/2023 Special and Regular
>
Agenda Packet_2023-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 2:26:10 PM
Creation date
3/15/2023 2:04:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
3/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1002
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />A 10-year 3rd party pre -paid insured warranty on the <br />FieldTurf artificial grass surface <br />1 <br />LS <br />INCLUDED <br />INCLUDED <br />13 <br />Taxes <br />1 <br />LS <br />$63,792.00 <br />$63,792.00 <br />Subtotal Synthetic Turf <br />$1,136,968.42 <br />14 <br />Performance & Payment Bonds <br />1 <br />LS <br />$33,035.29 <br />$33,035.29 <br />15 <br />Design fee <br />1 <br />LS <br />$32,000.00 <br />$32,000.00 <br />Dan Young Sports Complex TOTAL <br />$2,675,858.79 <br />PRODUCT DETAILS <br />FieldTurf, the worldwide leader in artificial turf, is pleased to offer the FieldTurf Vertex Prime with Core <br />and CoolPlay (FTVTC-1-CP), with the following product characteristics: <br />VERTEX PRIME CORE WITH COOLPLAY <br />Pile Height: 2.5 Inches <br />Infill Weight: 6.2lbs sand, 2.4lbs Cryogenic Rubber & 0.6lbs CoolPlay per sq.ft. <br />Pile Weight: 47 oz/yd2 <br />Total System Weight: 1393 oz/yd2 <br />FieldTurf has taken the necessary steps to ensure that your project will run smoothly and that the quality <br />promised will be the quality delivered. <br />CIVIL SCOPE INCLUDES: <br />Pricing is based upon Fieldturf plans dated 01/27/23. Pricing includes: <br />a) General conditions to include equipment mobilizations, construction staking, temporary <br />bathrooms as needed, rumble plates at field entrance, onsite supervision, erosion control BMPs. <br />b) Demolition onsite per plansheet L-3 & L-4 to include goalposts, storm drain line and catch basin <br />as noted, capping of irrigation, removing of irrigation laterals as needed, demo asphalt paving. <br />c) Earthwork to include removal of existing sod (assumed 3"), cut/fill site to balance site, finish grade <br />subgrade of field. <br />d) Drainage per plansheet L-7 & L-8 to include perforated collectors (6" & 8") per plans, nyloplast <br />basins, connection to existing storm drain outlet pipe, 1"xl2" flat tile. <br />e) Synthetic turf base to include soil separation fabric, composite nailer board at perimeter for turf <br />attachment, Furnish & install 6" permeable base course, fine grade fields to within Fieldturf <br />tolerances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.