My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-03-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/21/2023 Special and Regular
>
Agenda Packet_2023-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 2:26:10 PM
Creation date
3/15/2023 2:04:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
3/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1002
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 4 <br />PROJECT TITLE: <br />Dan Young Soccer Complex <br />Synthetic Turf <br />PROJECT CATEGORY: <br />City & Park Facility Improvements <br />Park Facility <br />LOCATION MAP <br />A <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET is <br />PROJECT DESCRIPTION: <br />The Dan Young Soccer Complex Synthetic Turf project will replace <br />the remaining, existing natural grass on Fields #1 and #3 with the <br />latest technology turf system which will enhance the field to optimum <br />use. <br />F <br />CT NEED: <br />Sports Complex (DYSC) hosts a multitude of sporting <br />the City and provides sports fields for athletes of all ages. <br />Centennial Park and comprised of four (4) large playing <br />C continues to serve as a focal point for the sporting <br />(Exhibit 1). All fields were initially natural grass, but Fields <br />were replaced with synthetic turf in 2004 and 2005. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24125 FY 25/26 FY 26/27 FY 27128 FY 28129 <br />Construction 2,675,859 - - - - - - <br />Contingency 295,000 <br />Engineering 531,370 <br />TOTAL 3,502,229 - - - - - <br />SOURCE OF FUNDS FY 22/23 FY 23124 FY 24125 FY 25126 FY 26127 FY 27128 FY 28129 <br />Cannabis 3,202,229 - - - - - - <br />CAPITAL OUTLAY/CELL 300,000 <br />TOWER <br />TOTAL 3,502,229 - - - - <br />AGENCY: DIVISION: <br />Parks, Rec. & Community Services Administration <br />CONTACT: <br />Sean Thomas, Senior Civil Engineer <br />DATE: <br />27-Feb-2023 <br />City Council 12 — 37 3/21/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.