My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELECNOR BELCO ELECTRIC, INC. (BRISTOL ST. & SANTA CLARA AVE. TRAFFIC SIGNAL MODIFICATION)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ELECNOR BELCO ELECTRIC, INC. (BRISTOL ST. & SANTA CLARA AVE. TRAFFIC SIGNAL MODIFICATION)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 12:30:53 PM
Creation date
3/24/2023 3:15:35 PM
Metadata
Fields
Template:
Contracts
Company Name
ELECNOR BELCO ELECTRIC, INC.
Contract #
P 22-6995
Agency
Public Works
Council Approval Date
3/7/2023
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 22-6995 <br /> BRISTOL ST AND SANTA CLARA AVE TRAFFIC SIGNAL MODIFICATION <br /> FEDERAL PROJECT NO.: HSIPL 5063(204) <br /> BID PROPOSAL <br /> TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br /> FROM: Elecnor Belco Electric,Inc. <br /> REQUIREMENT: <br /> The undersigned bidder declares that they have carefully examined the location of the proposed <br /> work, that they have examined the Contract Documents in its entirety and hereby proposes to <br /> furnish all material and do all the work required to complete the said work in accordance with said <br /> plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br /> schedule: <br /> Item Description Qty Unit Unit Price Amount <br /> 1 Traffic Signal Modification 1 LS $ $ <br /> 2(,3,000 24.3,E <br /> 2 Install Video Detection System at 1 LS $ $ <br /> Bristol St and Santa Clara Ave y2,300 42000 <br /> 3 *Install 2"PVC Conduit per Plan 100 LF $ $ <br /> �o ?,oar <br /> 4 *Install 3"PVC Conduit per Plan 100 LF $ $ <br /> 100 10,000 <br /> 5 *Install 4"PVC Conduit per Plan 500 LF S� S <br /> y1),000 <br /> 6 *Install No.6 Pull Box 6 EA $I,ZOrJ 112,30 <br /> 7 *Install No.6E Pull Box 2 EA 1'sgs $ (7b <br /> 8 *Remove and Replace Concrete 100 SF $ $ <br /> Sidewalk 1!nq•50 (0g5o <br /> 9 Cold Mill(2") 5900 SF $ $ <br /> 2•�5 t6,ZZ5 <br /> 10 Asphalt Rubber Hot Mix(ARHM) 74 TN $ $ Z •i <br /> 'lo3•ZH <br /> 11 Temporary Overhead Wiring at 1 LS $ $ <br /> Bristol St and Santa Clara Ave �(o�Sb0 ((p�$00 <br /> 12 Pothole Pole Locations for Utility 8 EA $ $�'g� <br /> Conflicts <br /> 13 Pothole Utility Not Shown on Plans 4 EA $ $Q SO q00 <br /> P-1 of P-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.