My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRUELINE CONSTRUCTION AND SURFACING
Clerk
>
Contracts / Agreements
>
T
>
TRUELINE CONSTRUCTION AND SURFACING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 11:26:03 AM
Creation date
3/24/2023 3:16:46 PM
Metadata
Fields
Template:
Contracts
Company Name
TRUELINE CONSTRUCTION AND SURFACING
Contract #
A-2023-017
Agency
Public Works
Council Approval Date
2/7/2023
Expiration Date
2/6/2026
Insurance Exp Date
7/25/2026
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally obli- C. When coverage for liability arising out of the <br /> gated to pay as damages caused by 'occurrences" "products-completed operations hazard" is provided, <br /> under Section I — Coverage A, and for all medical any payments for damages because of "bodily inju- <br /> expenses caused by accidents under Section I — ry" or "property damage" included in the "products- <br /> Coverage C, which cannot be attributed only to on- completed operations hazard" will reduce the <br /> going operations at a single designated construction Products-Completed Operations Aggregate Limit, and <br /> project shown in the Schedule above: not reduce the General Aggregate Limit, the Desig- <br /> nated Construction Project General Aggregate Limit, <br /> 1. Any payments made under Coverage A for dam- nor the All Designated Construction Project General <br /> ages or under Coverage C for medical expenses Aggregate Cap. <br /> shall reduce the amount available under the Gen- <br /> eral Aggregate Limit or the Products-Completed D. If the applicable designated construction project has <br /> Operations Aggregate Limit, whichever is applica- been abandoned, delayed, or abandoned and then <br /> ble; and restarted, or if the authorized contracting parties devi- <br /> ate from plans, blueprints, designs, specifications or <br /> 2. Such payments shall not reduce any Designated timetables, the project will still be deemed to be the <br /> Construction Project General Aggregate Limit or same construction project. <br /> the All Designated Construction Project General <br /> Aggregate Cap. E. The provisions of Section III — Limits Of Insurance <br /> not otherwise modified by this endorsement shall con- <br /> tinue to apply as stipulated. <br /> CGL 25 03 (08/19) Contains copyrighted material of Insurance Services Office, Inc. Page 2 of 2 <br /> Insured <br />
The URL can be used to link to this page
Your browser does not support the video tag.