My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(aw�, t <br />CITY OF SANTA ANA <br />C. Publication Process for Cultura <br />The City will lead publication efforts. The nature of the tasks involves ongoing <br />communication between City staff and the graphic artist via email and phone calls to <br />ensure a finished and professional product acceptable by the City. <br />2. The production timeline for Culture will span a minimum of 19 calendar days, but may <br />vary based on content or needs, as determined by the Project Manager. <br />3. Production begins once City staff provides the project content and ends once a digital <br />file is uploaded to the City's selected printer. <br />4. The graphic artist/design studio will design and provide a digital PDF proof to the City <br />for review during the review process. City staff will provide the graphic artist all drafts in <br />PDF files for proofing and correction, until publication is approved for sending to printer. <br />5. The graphic artist will provide files to the printer according to the printer's specifications <br />or as an acceptable industry standard format. The graphic artist will upload the digital <br />file via a File Transfer Protocol ("FTP") site to the City's printer. The graphic artist will <br />communicate the successful transfer of the file via email to the printer and City staff. <br />6. The graphic artist/design studio will email an electronic PDF version of the newsletter <br />for posting on the City's website. <br />7. The graphic artist/design studio will ensure all aspects of production are on schedule to <br />meet delivery, print and mailing deadlines. Additionally, the graphic artist/design studio <br />shall maintain open and regular communication with City staff and selected printer. <br />8. The publication process for other projects will be negotiated on a case -by -case basis <br />with the project manager. <br />D. Project Management <br />The City will require one kick-off meeting following contract award. Progress meetings will be <br />scheduled throughout the contract years, if needed. In -person meetings may be required as <br />determined by the City. <br />E. Additional Individual Services <br />These services can be priced individually as a la carte items for the proposal but they may <br />or not be included in the final agreement. <br />RFP No. 22-164 <br />The City may request additional photography from the graphic artist/design studio. <br />These services may be performed by the studio directly or they may source out, as <br />needed. <br />2. The City may have a need for translation services to produce a Spanish and Vietnamese <br />version of the Cultura. This will be determined by the Project Manager, as needed. <br />These services may be performed by the studio directly or they may source out, as <br />needed. <br />RFP Cultura Magazine Design Services Page 19 of 35 <br />City Council 15 — 16 4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.