My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�I Berg & Associates Inc. <br />Your Bridge to a Better P�ect <br />Utilization of New Rate for Office Engineer at 60% FTE: It is requested that the current administrative <br />positions (Brenda Ramirez, Contract Administrator, and Eric Vandenberg, Jr. Office Engineer) be replaced <br />with an Office Engineer (Carlos Quiroz, QSP) for a more technical assistance. Carlos's experience and skill <br />level will be a mitigation effort to allow for the PM/RE to minimize his hours from the current overage usage. <br />Cost of Office Engineer at 60% (Mar 23— End of Phase 2): $ 61,636.96 <br />Utilization of New Rate for Jr. Office Engineer at 20% (Feb 23 — May 23): Due to recent Change Orders <br />issued by OCTA, and continuing project challenges, we highly recommend keeping additional help on <br />through May 2023 to keep costs of PM/RE lower. Costs for this position in February 2023 are covered by <br />the originally planned hours for Contract Administrator. <br />Cost of Jr. Office Engineer at 20% (Mar 23 — May 23): $ 9,839.44 <br />Additional Cost for Scheduling Services: To ensure a coherent schedule from the Contractor it is <br />requested to extend the duration of the scheduler thru the Phase 1 period or at least a minimum of an <br />additional 6 months. For Phase 1, Mar 2023 — Nov 2023 and the first month of Phase 2,16hr/mo is 160hr <br />for Scheduler. <br />Additional Budget for Scheduling Services: $ 30,750.40 <br />Additional Cost for Specialty Inspection Services: RMA Group will be utilized to provide CWI <br />Inspection/Testing of Field Welding of Welded Steel Pipe CMLC (24", 16", 14", 10", 8", 6"). <br />Additional Budget for Specialty Inspection Services: $ 25,021.70 <br />Additional Cost for CWA Rate: The CWA rate results in a $ 34.09 increase to our originally planned <br />inspector rate. When this is applied to the additional time after Amendment 01 costs are expended, roughly <br />June 2023. <br />Additional Budget for CWA Rate with Schedule Extension: $ 53,474.80 <br />The attached spread sheet shows all additional costs dispersed for the entire Contract including actual <br />costs and forecasted costs. The amount needed to complete the project after budget expenditure through <br />March 2023 is shown in the table below, we would consider this amount Amendment 02: <br />Apr 2023 - Closeout Cost To Completion <br />Remainder Amendment 01 $ 10,446.24 <br />Forecasted Additional Costs (shown above) $ 190,192.50 <br />Planned FTE %- Original Schedule $ 263,197.50 <br />Planned FTE % - Contractor Extension $ 267,344.26 <br />Planned FTE % - Close out $ 44,144.08 <br />ESTIMATE TOTAL AMEDNMENT 02 $ 775,324.58" <br />A difference of —3k is shown on the spreadsheet, due to ODCs and marginal <br />estimate errors, all costs can be broken down further upon request. <br />City Council 17 — 7 4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.