My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO, 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PEAS TREATMENT SYSTEMS <br />C. PROJECT ADDENDAS <br />The GonsGtant is responsible for assisting with any addGrda required during the bidding <br />process. The City shall work in conjunction with the Consultant in bidding out the project, <br />providing clarification and evaluating the potential: Construction Contractors. <br />4, CONSTRUCTION PRASE <br />Upon request, 'thc Consultant shall provide general: services to support the construction efforts <br />and serve as an extension or City staff to assist In the overall delivery of the: project, including <br />pre -construction tasks, reviewing construction submittals and ensuring that the work is <br />completed in accordance with the bohtract documents, project closeout and commissioning <br />phase. <br />A. SUIBMITTALfSHOP DRAWING REVIEW <br />The Consultant shall be responsible for revfew of completeness and quantity of all required <br />shop drawirgs, .product data, samples and other submittals. The Consultant shall transmit <br />the Submittals to City staffing for review and :approval, and shall establish and imploment <br />procedures for expediting the processing and approval of Submittals, <br />D. REQUEST FOR INFORMATION (RFI) RESPONSE <br />The Consultant shall assist with requests for information(RFls) and shall update the City on <br />all RFls issued in the duration of the project, The Consultant shall maintain, at the job site, <br />records of contract documents including drawings, addenda, change orders, and other <br />modifications of plans and specifications marked to show all changes made during <br />construction. The Consultant shall also maintain -as-guilt records of :underground utilities, <br />including locations and depths of trenches. At the completion of the project, the Consultant <br />shall deliver to the City all contract doeurnents'including .as -built records, <br />C, CHANGE ORDERS <br />The Consultant shall conduct comprehensive evaluation of change order requests, provide <br />independent estimates, render recommendations and assist in claim resolution, The <br />Consultant shall regularly monitor and report on the status of the Project Construction <br />Budget on a monthly basis, indicating actual costs for completed activities and work in <br />progress, and indicating estimates for uncompleted work. Report should Identify variances <br />between actual and budgeted or estimated costs, and shall advise the City whenever it <br />appears that the Actual Construction Cost has exceeded, or will exceed, :the Project <br />Construction Budget for the entire Project or any Project Component. <br />D. PROJECT CLOSEOUT <br />The Consultant shall evaluate the completion of the work of the Construction Contractor and <br />City of Santa Ana RFP.22-133 <br />on -Call Engineering Design Services for PFAS Treatment Systems <br />Page 20 <br />City Council 19 — 20 4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.