My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />A TETRA TECH COMPANY <br />City of Newport Beach <br />Project Manager of a 5-year <br />Established City pain -points <br />outages, operating costs and <br />Matt Avila, PMP <br />Annual Support Contract <br />Professional Services Agreement to the City of Newport Beach. <br />and developed multi -year SCADA improvement plan, reducing City <br />improving SCADA system reliability. <br />Amazon Multiple Projects <br />With a previous employer, Program Manager of $25M+ annual budget across 6 key initiatives, <br />improving end -to -end warehouse logistics within the customer enterprise. Developed projects from <br />Alpha concept, through Beta testing to mass production of machines within defined OEE and cost - <br />analysis parameters. Designed, built and tested multiple independent machines from a <br />mechanical, electrical and controls perspective. <br />• Corning Connector Assembly System <br />With a previous employer, Project Manager of a $2M budget to develop, design, build and test a <br />fully automated connector assembly machine validating 16 key characteristics per part. Capable <br />of producing 150 parts/min with a <3% scrap rate, replacing a previously manual process. <br />Work Experience <br />• Enterprise Automation, Remote, Project Manager Jan 2020 — Present <br />• JR Automation, Holland, MI, Project/Program Manager Nov 2017 — December 2019 <br />• United States Air Force, multiple locations, Officer May 2011 —Nov 2017 <br />• United States Air Force, multiple locations, Enlisted Sep 2005 — Jun 2007 <br />ENTERPRISE <br />Ity oTd 'n c' if IU L30DUARD 0 IRVINE,19_ 184 ATOR.COM <br />City of Santa Ana I On -Call Engineering Design Services for PFAS Treatment Systems RFP NO. 22-133 A-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.