My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY or SANTA ANA <br />RFP NO- 22.133 <br />0N•CALL ENGINEERING DESIGN SERVICES FOR PFAS TREATMENT SYSTEMS <br />d) Other Items and Expenditures............... --- ........_..................... 15 <br />H. MINIMUM QI IALiFICATrONS <br />The Consultant shall meet the fallowing minimum clualrficatbons <br />1- At] work Is to be performed in compliance with all applicable codes, ordinances, laws. <br />standards, due care, and Occupational Safety and Health Administrabon (OSHA) <br />safety requirements, <br />2. The Contractor shall have a minimum of five (5) years of experience in providing the <br />services described in ATTACHMENT 1; SCOPE OF SERVICES_ <br />3. The Contractor shall possess state and local permits, licenses and certificates <br />required by law to commence. carry, and completes the work. <br />4. ProlAde all necessary equipment to competently perform and complete work as <br />specified. <br />I, SAFETY <br />Proposar shall be solely and completely responsible for the condition of the project site, including <br />safety of all persons and properties during the performance of the work. In addition, proper safely <br />equipment must be wom at all times_ These requirements shall apply continuously unfil the <br />contract is terminated and shall not be limited to normal working hours_ <br />The Cormullant shall asaurs that each employee or subcontractor under the contractors <br />supervision is trained in the work practices necessa ry to safety perform his or her job. <br />The Consultant's drivers/delivery crews shall be HA?MAT trained and certified in safety <br />measures to prevent accidents endangering personnel and property_ Hazardous Materials shall <br />be clearly marked with the proper shipping name and identification number as required by the <br />Department of Transportation. The Consultant shall provide current, applicable and required <br />Material Safety Data Sheets (MS IDS) at eny time during the contract as requested by the 04 of <br />Santa Ana, <br />J. INSURANCE REQUIREMENTS <br />The successful bidders shall furnish the City with original copies of valid insurance policies herein <br />required upon execution of the contract and shall maintain said policies In full force and effect at <br />all times during the term of this contract_ Said insurance policies shall comply with all <br />requirements set forlh in these specifications. Consultani(s) shall keep a current certificate of <br />insurance at the City of Santa Ana at all times and shall immediately report any changes to the <br />city. <br />K. FEE SCHEDULE <br />The Consultant shall submit a fee schedule and labor rates as descntred in Section III.B.3 of <br />City 0 Santa Ana RFP 22-13 3 <br />On -Gall EngineeringDe%ign -Services for PFAS Trealmanl SysW <br />City Council Page 22 19 — 218 4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.