CITY OF SANTA ANA <br /> 1 PUBLIC WORKS AGENCY <br /> ,z <br /> 1 CONTRACT CHANGE ORDER <br /> Project Number Project No. 22-6622—Downtown Flood Reduction & Stormwater Change Order Number 3 <br /> Infiltration <br /> To GMZ Engineering Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> JUSTIFICATION <br /> 1. To compensate contractor for full depth and replacement of AC from Spurgeon to Bush on 3rd <br /> Street& scarify existing native soil to meet 95% compaction per RFI #23 (PCO#20) <br /> AGREED COST: $98,172.00 <br /> 2. To compensate contractor for furnish and installing 4' boulder& installing a 18"x18" Chinatown <br /> plaque provided by the City. (PCO#24) <br /> AGREED COST: $3,254.48 <br /> 3. To compensate contractor for providing revised Traffic Control Plans (TCP) to accommodate <br /> traffic flow on Main and 3rd street and two (2) PCMS to be installed per City's request. <br /> (PCO#25) <br /> AGREED COST: $5,830.73 <br /> 4. To compensate contractor for new main irrigation line throughout the parking lot per RFI #36. <br /> (PCO#26) <br /> AGREED COST: $17,346.75 <br /> 5. To compensate contractor for additional striping per City's direction based on field conditions, <br /> (PCO#27) <br /> AGREED COST: $6,175.29 <br /> TOTAL AGREED COST: $130,779.25 <br /> Page 1 of 2 <br />